Loading
Page views this IP this session = 1 of 10 unsubscribed pagesMaenhir Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Maenhir Wind Farm (Wind , Active) Location in the UK : Wales, SA34 0XE Type of installation: Wind on/offshore: on Turbines :1 Capacity : 0.1 MW Approx Date of 1st power generation: June 2016
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Not an exact location
Model: |
EWT DW 61
|
Start Speed: |
2.5
|
Capacity: |
0.5
|
Optimal Speed: |
11.5
|
Rotor Diameter: |
61
|
Stop Speed: |
25
|
Hub Height |
0 Avg for all turbines:0
|
Avg. Elevation: |
158
|
Web Page: |
http://www.ewtdirectwind.com/wind-turbines/service-performance.html#c925 |
Comment: |
|
Land at Maenhir Farm Maenhir Login Whitland SA34 0XE Wales
Relationship |
Company (For:
Maenhir
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Maenhir
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01617NWWA
|
Capacity: |
91.3
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
6/27/2016
|
|
|
Applicant: |
CWE Norwin Ltd
|
Applicant Address: |
Constantine Group plc
River Court
GODALMING
GU7 1EZ
England
|
Address: |
Land at Maenhir Farm
Maenhir
Login
Whitland
SA34 0XE
Wales
|
|
Assumptions: Capacity: 91.3kW 0.0913 MW, Thus over the month Capacity * 720 hours per month = 65.736 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
| | | 15 | 16.43% | Issued | | | | 17 | 18.62% | Issued | | | | 27 | 29.57% | Redeemed | | | | 26 | 28.48% | Redeemed | 01/01/2017 | | | 21 | 23.00% | Redeemed | 01/09/2016 - 30/09/2016 | 0 | 0 | 21 | 23.00% | Issued | 01/08/2016 - 31/08/2016 | 0 | 0 | 20 | 21.91% | Issued | 01/07/2016 - 31/07/2016 | 0 | 0 | 14 | 15.33% | Issued | | | | 21 | 23.00% | Issued | | | | 29 | 31.76% | Issued | | | | 16 | 17.52% | Issued | | | | 33 | 36.14% | Issued | | | | 23 | 25.19% | Issued | | | | 28 | 30.67% | Issued | | | | 27 | 29.57% | Issued | | | | 23 | 25.19% | Issued | | | | 14 | 15.33% | Issued | | | | 28 | 30.67% | Issued | | | | 23 | 25.19% | Issued |
|
Capacity: 0.2 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/6/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
Sorry I found no matches, Please try again.
|
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|