Loading
Page views this IP this session = 1 of 10 unsubscribed pagesCarlton on Trent Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Carlton on Trent Wind Farm (Wind , Active) Location in the UK : England, NG 23 6NY Type of installation: Wind on/offshore: on Turbines :1 Capacity : 0.5 MW Approx Date of 1st power generation: March 2012
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Refused / Appeal Allowed 12/00949/FUL | Installation of 1 wind turbine, with a maximum height to tip of 77m, a section of new access track, a hardstanding, a small substation and associated infrastructure. | Field Reference 0778 Off Ossington Road Carlton On Trent Nottinghamshire
Model: |
EWT DW52/54
|
Start Speed: |
2.5
|
Capacity: |
0.9
|
Optimal Speed: |
13
|
Rotor Diameter: |
54
|
Stop Speed: |
25
|
Hub Height |
51 Avg for all turbines:51
|
Avg. Elevation: |
96
|
Web Page: |
http://www.ewtdirectwind.com/wind-turbines/ewt-wind-turbines/dw5254-900kw.html |
Comment: |
The DIRECTWIND 52/54-900kW is a pitch controlled variable speed wind turbine that combines continuous market driven innovation with highly advanced direct drive technology.
|
South of Ossington Road Carlton On Trent Newark NG 23 6NY England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
COT Project Carlton wind turbine
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01959NWEN
|
Capacity: |
480
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
4/3/2012
|
|
|
Applicant: |
CoT Projects Ltd.
|
Applicant Address: |
Stephenson Nuttall And Co
6-8 Castle Gate
NEWARK
NG24 1AX
England
|
Address: |
South of Ossington Road
Carlton On Trent
Newark
NG 23 6NY
England
|
|
Assumptions: Capacity: 480kW 0.48 MW, Thus over the month Capacity * 720 hours per month = 345.6 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/07/2016 - 30/09/2016 | 0 | 0 | 270 | 56.25% | Issued | Jun-16 | 0 | 0 | 53 | 11.04% | Issued | May-16 | 0 | 0 | 102 | 21.25% | Issued | Apr-16 | 0 | 0 | 83 | 17.29% | Issued | Mar-16 | 0 | 0 | 111 | 23.13% | Issued | Feb-16 | 0 | 0 | 143 | 29.79% | Issued | Jan-16 | 0 | 0 | 153 | 31.88% | Redeemed | Dec-15 | 0 | 0 | 229 | 47.71% | Redeemed | Nov-15 | 0 | 0 | 181 | 37.71% | Redeemed | Oct-15 | 0 | 0 | 66 | 13.75% | Redeemed | Sep-15 | 0 | 0 | 52 | 10.83% | Redeemed | Aug-15 | 0 | 0 | 83 | 17.29% | Redeemed | Jul-15 | 78 | 0 | 78 | 16.25% | Redeemed | Jun-15 | 82 | 0 | 81 | 16.88% | Redeemed | May-15 | 128 | 0 | 128 | 26.67% | Redeemed | Apr-15 | 81 | 0 | 81 | 16.88% | Redeemed | Mar-15 | 165 | 0 | 165 | 34.38% | Redeemed | Feb-15 | 116 | 0 | 116 | 24.17% | Redeemed | Jan-15 | 186 | 0 | 186 | 38.75% | Redeemed | Dec-14 | 181 | 0 | 180 | 37.50% | Redeemed | Nov-14 | 83 | 0 | 83 | 17.29% | Redeemed | Oct-14 | 138 | 0 | 137 | 28.54% | Redeemed | Sep-14 | 33 | 0 | 33 | 6.88% | Redeemed | Aug-14 | 113 | 0 | 113 | 23.54% | Redeemed | Jul-14 | 65 | 0 | 65 | 13.54% | Redeemed | Jun-14 | 35 | 0 | 1 | 0.21% | Redeemed | May-14 | 91 | 0 | 90 | 18.75% | Redeemed | Apr-14 | 89 | 0 | 89 | 18.54% | Redeemed | Mar-14 | 129 | 0 | 129 | 26.88% | Redeemed | Feb-14 | 209 | 0 | 209 | 43.54% | Redeemed | Jan-14 | 161 | 0 | 161 | 33.54% | Redeemed | Dec-13 | 193 | 0 | 195 | 40.63% | Redeemed | Nov-13 | 100 | 0 | 100 | 20.83% | Redeemed | Oct-13 | 162 | 0 | 163 | 33.96% | Redeemed | Sep-13 | 68 | 0 | 1 | 0.21% | Redeemed | Aug-13 | 85 | 0 | 84 | 17.50% | Redeemed | Jul-13 | 47 | 0 | 47 | 9.79% | Redeemed | Jun-13 | 81 | 0 | 82 | 17.08% | Redeemed | May-13 | 118 | 0 | 119 | 24.79% | Redeemed | Apr-13 | 147 | 0 | 148 | 30.83% | Redeemed | Mar-13 | 126 | 0 | 128 | 26.67% | Redeemed | Feb-13 | 105 | 0 | 106 | 22.08% | Redeemed | Jan-13 | 110 | 0 | 111 | 23.13% | Redeemed | Dec-12 | 155 | 0 | 157 | 32.71% | Redeemed | Nov-12 | 115 | 0 | 117 | 24.38% | Redeemed | Oct-12 | 101 | 0 | 102 | 21.25% | Redeemed | Sep-12 | 125 | 0 | 127 | 26.46% | Redeemed | Aug-12 | 68 | 0 | 69 | 14.38% | Redeemed | Jul-12 | 65 | 0 | 65 | 13.54% | Redeemed | Jun-12 | 117 | 0 | 118 | 24.58% | Redeemed | May-12 | 89 | 0 | 90 | 18.75% | Redeemed | Apr-12 | 86 | 0 | 87 | 18.13% | Redeemed | | | | 186 | 38.75% | Issued |
|
Capacity: 1 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
Sorry I found no matches, Please try again.
|
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|