Page views this IP this session = 1 of 10 unsubscribed pagesPen y Fan Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Pen y Fan Wind Farm (Wind , Active) Location in the UK : Wales, NP11 3XG Type of installation: Wind on/offshore: on Turbines :1 Capacity : 1.56 MW Approx Date of 1st power generation: January 2017
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
It is a second hand re-conditioned Vestas V66 1.65MW from the Netherlands with a hub height of 79m and rotor diameter of 66m.
Model: |
Vestas V66
|
Start Speed: |
5
|
Capacity: |
2
|
Optimal Speed: |
15
|
Rotor Diameter: |
66
|
Stop Speed: |
25
|
Hub Height |
79 Avg for all turbines:79
|
Avg. Elevation: |
211
|
Web Page: |
|
Comment: |
|
Pen-y-Fan Industrial Estate Croespenmaen Crumlin Newport NP11 3XG
Relationship |
Company (For:
Pen y Fan
) |
Developer | Sirius Group |
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Land At Pen Y Fan 1.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Caerphilly Country: Wales LPA: Caerphilly County Borough Council
|
Site ID and Reference: |
5294 /
District:
|
Applicant: |
Clenergy
Application :
15/0388/FULL
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
1 |
Turbine Capacity: |
1.5 |
Height of Turbines: |
124 |
Calculated capacity: |
1.5 |
Site Address: |
Land At Pen Y Fan, Industrial Estate Pen Y Fan, Newport, Gwent
|
|
NP11 3AA
|
County: |
Caerphilly Region: Wales
|
OS Coordinates: |
319869 / 319869
|
Development Status: |
Planning Application Withdrawn
|
Application Submitted: |
6/5/2015
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
8/5/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
7/28/2015 |
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Pen y Fan Wind Turbine
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01661NWWA
|
Capacity: |
1480
|
Status: |
Live
|
Accreditation Date: |
6/5/2015
|
|
|
Commission Date: |
1/21/2017
|
|
|
Applicant: |
SRE (Pen Y Fan) Limited
|
Applicant Address: |
Sirius
Russell House
Langley Moor
Durham
DH7 8HJ
England
|
Address: |
Land adjacent to Abingdon Flooring
Parkway
Pen y Fan Industrial Estate
Crumlin
NP113XG
Wales
|
|
Assumptions: Capacity: 1480kW 1.48 MW, Thus over the month Capacity * 720 hours per month = 1065.6 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
| | | 168 | 11.35% | Issued | | | | 94 | 6.35% | Issued | | | | 283 | 19.12% | Issued | | | | 65 | 4.39% | Issued | | | | 195 | 13.18% | Issued | | | | 394 | 26.62% | Issued | | | | 116 | 7.84% | Issued | | | | 149 | 10.07% | Issued | | | | 279 | 18.85% | Issued | | | | 147 | 9.93% | Issued | | | | 207 | 13.99% | Issued | | | | 179 | 12.09% | Issued | | | | 179 | 12.09% | Issued | | | | 269 | 18.18% | Issued | | | | 250 | 16.89% | Issued | | | | 144 | 9.73% | Issued |
|
Capacity: 3.3 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 1/15/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|