Weston Energy from Waste Plant

Weston (Waste , Active, aa 1mw or less)

 General Information.

Location in the UK : England,    
Type of installation: Waste    on/offshore: on
Turbines :0  Capacity : 2 MW
Approx Date of 1st power generation: December 2003

/YES

 Comment

??

 Address

Weston Landfill,South of Northampton,(M1 J16)

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Weston )

 DECC Data on this Project: Weston :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Weston Landfill Site     2 MW
Energy Type: Landfill Gas
County: Northamptonshire     Country: England     LPA: South Northamptonshire Council
Site ID and Reference: 678 / N00116L     District:
Applicant: Vivid Waste Management     Application : SN/01/1584C (Go to search to find Application)
Site Address: Weston Landfill, South of Northampton, (M1 J16)
 
County: Northamptonshire Region: East Midlands
OS Coordinates: 467080 / 467080
Development Status: Operational
Application Submitted: Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 12/31/2003 This Record Last Updated: 7/21/2005
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Weston: Waste :

Project Info
Plans put forward for new solar farm near Congresbury
Renewable energy firm UK Solar Assets has drawn up plans for a 1.3 megawatt solar energy farm on a 2.2-hectare site – more than 20,000 square metres – along the A370 at Pilhay Farm, WESTON Road in Hewish.

(2009) WESTON TURBINES – SAY NO
NHDC Planning Control Committee voted unanimously to reject the application following a recommendation by the planning officer to refuse. Further documentation will be posted in due course. It is not known whether the applicant will appeal.

INRG wins permission for 16MW solar farm on former airbase site
Aylesbury Vale District Council planners have given approval for the facility, which would extend to 35 hectares at the western end of TurWESTON Airfield near Brackley.

Solar Farm Proposal Clayhill Farm WESTONing
The developer, a company called Axiom, set out plans to install a large (19 MW) solar farm covering 36 ha of farmland, which will generate electricity for the grid.

Concern over solar farm application
The proposal for 36,000 solar panels to be built in a field at Woodforde Farm, WESTON Longville, has been submitted by British renewable energy company Esconrg. The full size of the development, including converter buildings, would be 19 hectares.

©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School