Loading
Page views this IP this session = 1 of 10 unsubscribed pagesHyde Solar Farm
Hyde Solar Farm (Solar , Active) Location in the UK : England, SK14 2DL Type of installation: Solar on/offshore: on Solar Panels :0 Capacity : 0.9126 MW Approx Date of 1st power generation: January 2016
/YES
Hyde WwTW Mill Lane Hyde SK14 2DL England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Hyde WwTW Ground Solar
|
Generator Type: |
Photovoltaic
|
Scheme : |
REGO
|
Generator ID: |
G07695PVEN
|
Capacity: |
912.6
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
8/1/2016
|
|
|
Applicant: |
United Utilities Renewable Energy Limited
|
Applicant Address: |
United Utilities
Lingley Green Avenue
Great Sankey
WARRINGTON
WA5 3LP
England
|
Address: |
Hyde WwTW
Mill Lane
Hyde
SK14 2DL
England
|
|
Assumptions: Capacity: 912.6kW 0.9126 MW, Thus over the month Capacity * 720 hours per month = 657.072 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
Sorry I found no matches, Please try again.
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|