Sorry I found no matches, Please try again. 176
vid = 5249pws_id = 353736pws_id = 353736
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.133.129.8 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Boghead Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Boghead Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, ML3 8RY    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 0.48 MW
Approx Date of 1st power generation: September 2015

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Boghead wind turbine was developed by Lomond Energy and was successfully granted planning permission by South Lanarkshire Council in June 2014.

The site is located to the west of Limekilnburn, adjacent to the A723 Hamilton to Strathaven public road in South Lanarkshire.

 Turbine Make and Specs

Model: EWT DW52/54 Start Speed: 2.5
Capacity: 0.9 Optimal Speed: 13
Rotor Diameter: 54 Stop Speed: 25
Hub Height 50   Avg for all turbines:55 Avg. Elevation: 218
Web Page: http://www.ewtdirectwind.com/wind-turbines/ewt-wind-turbines/dw5254-900kw.html
Comment: The DIRECTWIND 52/54-900kW is a pitch controlled variable speed wind turbine that combines continuous market driven innovation with highly advanced direct drive technology.

 Address

Boghead Farm Strathaven Road Hamilton ML3 8RY Scotland

 Associated Companies.

Relationship Company (For: Boghead )
OperatorCleanearth Energy
FinanceTemporis Capital LLP

 DECC Data on this Project: Boghead :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

 OFGEM Data on this Project: Boghead: Wind :

Site Name: Boghead
Generator Type: Wind
Scheme : REGO Generator ID: G02521NWSC
Capacity: 480 Status: Live
Accreditation Date:    
Commission Date: 9/26/2016    
Applicant: Clean Earth Energy Wind InvestmentsLtd
Applicant Address: Clean Earth Unit 2a Bess Park Road Trenant Industrial Estate Wadebridge PL27 6HB England
Address: Boghead Farm Strathaven Road Hamilton ML3 8RY Scotland
 
Assumptions: Capacity: 480kW 0.48 MW,
Thus over the month Capacity * 720 hours per month = 345.6 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
97 20.21% Issued
162 33.75% Issued
148 30.83% Issued
161 33.54% Issued
01/01/2017 137 28.54% Issued
01/12/2016 - 31/12/2016 00 183 38.13% Issued
01/11/2016 - 30/11/2016 00 103 21.46% Issued
01/10/2016 - 31/10/2016 00 69 14.38% Issued
01/09/2016 - 30/09/2016 00 33 6.88% Issued
129 26.88% Issued
148 30.83% Issued
107 22.29% Issued
99 20.63% Issued
107 22.29% Issued
136 28.33% Issued
195 40.63% Issued
167 34.79% Issued
172 35.83% Issued
160 33.33% Issued
134 27.92% Issued

 Calculations


Capacity: 2
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/27/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 2 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 353736

Project Info
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School