Loading
Page views this IP this session = 1 of 10 unsubscribed pagesBywaters� Solar Farm
Bywaters� Solar Farm (Solar , Active) Location in the UK : England, E3 3JG Type of installation: Solar on/offshore: on Solar Panels :0 Capacity : 1 MW Approx Date of 1st power generation: January 2017
/YES
15/02981/PREPV | Prior Approval for the installation, alterations or replacement of other Solar Photovoltaics (PV) equipment on Roofs of Non-domestic buildings (Bywaters Recycling). | Unit J Prologis Park Twelvetrees Crescent Bromley By Bow London E3 3JG Unit J Prologis Park Twelvetrees Crescent Bromley By Bow London E3 3JG
Sorry I found no matches, Please try again.
Relationship |
Company (For:
Bywaters�
) |
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Bywaters� Materials Recovery Facility Solar Array 1 MW
|
Energy Type: |
Solar Photovoltaics |
County: |
London Country: England LPA: Newham London Borough Council
|
Site ID and Reference: |
6320 /
District:
|
Applicant: |
Bywaters
Application :
15/02981/PREPV
|
(Go to search to find Application) |
|
--- For Solar Farms / Parks --- |
Mounting of panels: |
Roof |
|
|
|
--- ----- ---- --- |
Site Address: |
Unit J Prologis Park Twelvetrees Crescent Bromley By Bow London E3 3JG
|
|
E3 3JG
|
County: |
London Region: London
|
OS Coordinates: |
538372 / 538372
|
Development Status: |
Operational
|
Application Submitted: |
10/19/2015
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
12/24/2016
|
|
|
Generator Live |
1/24/2017
|
This Record Last Updated: |
2/3/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Project Info |
Sorry I found no matches, Please try again.
|
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|