Page views this IP this session = 1 of 10 unsubscribed pagesChilton Biomass Energy
Chilton (Biomass , Active) Location in the UK : England, Type of installation: Biomass on/offshore: on Turbines :0 Capacity : 18 MW Approx Date of 1st power generation: March 2012
/YES
Installation and Operation of a Biomass Fired Heat and Power Plant and Ancillary Facilities including offices, storage and processing plant and equipment and reconfiguration of existing wood pellet factory - WPE Site Chilton Industrial Estate - Dalkia Bio Energy Limited, Staines, Middlesex - Plan Ref : 7/2008/0522/DM. Chilton Industrial Estate, Chilton, Ferryhill, County Durham
Relationship |
Company (For:
Chilton
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Chilton Energy Plant 18 MW
|
Energy Type: |
Biomass (dedicated) |
County: |
County Durham Country: England LPA: Durham County Council
|
Site ID and Reference: |
14 / A0331
District:
|
Applicant: |
Dalkia
Application :
7/2008/0522/DM
|
(Go to search to find Application) |
Site Address: |
Chilton Industrial Estate, Chilton, Ferryhill,
|
|
|
County: |
County Durham Region: North East
|
OS Coordinates: |
428049 / 428049
|
Development Status: |
Operational
|
Application Submitted: |
9/17/2008
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
3/1/2010
|
|
|
Generator Live |
3/12/2012
|
This Record Last Updated: |
4/4/2012
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|