Loading
Page views this IP this session = 1 of 10 unsubscribed pagesKincardine Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Kincardine Wind Farm (Wind , Active) Location in the UK : Scotland, Laurencekirk, Grampian Type of installation: Wind on/offshore: off Turbines :5 Capacity : 50 MW Approx Date of 1st power generation: September 2021
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Once fully completed by the end of 2020, Kincardine will comprise one 2 MW and five 9.6 MW MHI Vestas wind turbines, becoming the largest operating floating wind farm in the world. Turbine locations will need to be revised when project approved / started
Model: |
Vestas V164-9.5MW
|
Start Speed: |
0
|
Capacity: |
9.5
|
Optimal Speed: |
0
|
Rotor Diameter: |
164
|
Stop Speed: |
0
|
Hub Height |
107 Avg for all turbines:107
|
Avg. Elevation: |
-57
|
Web Page: |
https://en.wind-turbine-models.com/turbines/1605-mhi-vestas-offshore-v164-9.5-mw |
Comment: |
|
Kincardine Offshore Windfarm, Laurencekirk, Grampian
Relationship |
Company (For:
Kincardine
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Kincardine Offshore Windfarm 49.5 MW
|
Energy Type: |
Wind Offshore |
County: |
Offshore Country: Scotland LPA: Marine Scotland
|
Site ID and Reference: |
6136 /
District:
|
Applicant: |
Grupo Cobra
Application :
APP/2016/1726
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
6 |
Turbine Capacity: |
9.5 |
Height of Turbines: |
176 |
Calculated capacity: |
57 |
Site Address: |
Kincardine Offshore Windfarm, Laurencekirk, Grampian
|
|
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
407766 / 407766
|
Development Status: |
Operational
|
Application Submitted: |
6/16/2016
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
10/1/2018
|
|
|
Generator Live |
10/19/2021
|
This Record Last Updated: |
3/2/2022
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Kincardine Offshore Windfarm
|
Generator Type: |
Off-shore wind - Floating Turbines (ROS code = FT)
|
Scheme : |
RO
|
Generator ID: |
P00003FTSC
|
Capacity: |
48608
|
Status: |
Preliminary
|
Accreditation Date: |
6/16/2016
|
|
|
Commission Date: |
5/1/2018
|
|
|
Applicant: |
Kincardine Offshore Windfarm Limited
|
Applicant Address: |
Saltire Court
20 Castle Terrace
Edinburg
eh1 2en
Scotland
|
Address: |
Offshore of Unit 14 A
Peterseat Drive
Altens Industrial Estate
Aberdeen
AB12 3HT
Scotland
|
Capacity: 96 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 11/23/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|