Badachro

Badachro (Hydro , Active)

 General Information.

Location in the UK : Scotland, IV21 2AN    
Type of installation: Hydro    on/offshore: on
Turbines :0  Capacity : 1.5 MW
Approx Date of 1st power generation: December 2016

/YES

 Comment

 Address

Badchro Hydro Cammassie Wood Gairloch IV21 2AN Scotland

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Badachro )

 DECC Data on this Project: Badachro :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Badachro hydro scheme     1.5 MW
Energy Type: Small Hydro
County: Highland     Country: Scotland     LPA: Highland Council
Site ID and Reference: 491 / C3238     District:
Applicant: Badachro Hydro Limited     Application : 14/02596/FUL (Go to search to find Application)
Site Address: Land Between Loch Braigh Horrisdale And River Badachro Gairloch
 
County: Highland Region: Scotland
OS Coordinates: 179040 / 179040
Development Status: Operational
Application Submitted: 7/7/2014 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 6/30/2014    
Generator Live 12/21/2016 This Record Last Updated: 2/21/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 9/30/2017    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Badachro hydro scheme     1.5 MW
Energy Type: Small Hydro
County: Highland     Country: Scotland     LPA: Highland Council
Site ID and Reference: 490 / IM0064     District:
Applicant: Private Developer     Application : 14/00516/FUL (Go to search to find Application)
Site Address: Land Between Loch Braigh Horrisdale And River Badachro Gairloch
 
County: Highland Region: Scotland
OS Coordinates: 179040 / 179040
Development Status: Revised
Application Submitted: 2/17/2014 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 8/14/2014
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn: 7/4/2014    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Badachro: Hydro :

Site Name: Badachro Hydro
Generator Type: Hydro
Scheme : REGO Generator ID: G01847HYSC
Capacity: 1498 Status: Live
Accreditation Date: 2/17/2014    
Commission Date: 9/15/2016    
Applicant: Badachro Hydro Ltd
Applicant Address: Inverbraan Little Dunkeld PH8 0AD Scotland
Address: Badchro Hydro Cammassie Wood Gairloch IV21 2AN Scotland
 
Assumptions: Capacity: 1498kW 1.498 MW,
Thus over the month Capacity * 720 hours per month = 1078.56 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
748 49.93% Redeemed
480 32.04% Redeemed
01/01/2017 755 50.40% Redeemed
01/12/2016 - 31/12/2016 00 347 23.16% Issued
790 52.74% Issued
510 34.05% Issued
713 47.60% Issued
1048 69.96% Issued
931 62.15% Issued
1047 69.89% Issued
605 40.39% Issued

Project Info
Sorry I found no matches, Please try again.
©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School