Bad a Cheo Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Bad a Cheo Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Achkeepster    
Type of installation: Wind    on/offshore: on
Turbines :13  Capacity : 32.5 MW
Approx Date of 1st power generation: 05/2019

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

14/04219/SCRE | Construction of a 13 turbine wind farm (Bad a Cheo Wind Farm) without compliance with Condition 1 of permission 14/02480/S42. | Bad A Cheo Achkeepster Spittal

 Turbine Make and Specs

Model: Senvion MM92 Start Speed: 4
Capacity: 2 Optimal Speed: 12
Rotor Diameter: 92 Stop Speed: 25
Hub Height 75   Avg for all turbines:75 Avg. Elevation: 87
Web Page: http://www.repower.de/wind-power-solutions/wind-turbines/5m/
Comment: The reliable gearbox and generator technology of the MM82 is also the basis for the MM92 wind power plants.

 Address

Bad A Cheo Achkeepster Spittal

 Associated Companies.

Relationship Company (For: Bad a Cheo )
DeveloperRWE Innogy

 DECC Data on this Project: Bad a Cheo :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Bad a Cheo Wind Farm     26.7 MW
Energy Type: Wind Onshore
County: Highland     Country: Scotland     LPA: Highland Council
Site ID and Reference: 4646 / AA662     District:
Applicant: Innogy     Application : 12/02868/FUL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 13 Turbine Capacity: 2.0499999999999998
Height of Turbines: 112 Calculated capacity: 26.65
Site Address: Bad A Cheo Achkeepster Spittal
 
County: Highland Region: Scotland
OS Coordinates: 316615 / 316615
Development Status: Operational
Application Submitted: 7/25/2012 Planning Permission Granted
Application Determined: Permission refused: 9/19/2013
Construction Date: 3/15/2017    
Generator Live 5/1/2019 This Record Last Updated: 5/31/2019
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 9/19/2013

 OFGEM Data on this Project: Bad a Cheo: Wind :

 Calculations


Capacity: 65
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 2/5/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 65 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 351087

Project Info
©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School