Pen Bryn Oer Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Pen Bryn Oer Wind Farm (Wind , Active)

 General Information.

Location in the UK : Wales,    
Type of installation: Wind    on/offshore: on
Turbines :3  Capacity : 4 MW
Approx Date of 1st power generation: February 2018

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Guessing at GE 77

 Turbine Make and Specs

Model: GE 1.5 - 77 Start Speed: 4
Capacity: 1.5 Optimal Speed: 15
Rotor Diameter: 77 Stop Speed: 25
Hub Height 71   Avg for all turbines:71 Avg. Elevation: 419
Web Page: http://tinyurl.com/mj649ee
Comment: GEs Class I 1.5-77 wind turbine. GE advanced its original Class I wind turbine, the 1.5-70.5, with increased rotor length, and controls technology resulting in a greater annual energy production.

 Address

Pen Bryn Oer, Merthyr Road, Rhymney

 Associated Companies.

Relationship Company (For: Pen Bryn Oer )
ConsultantAMEC

 DECC Data on this Project: Pen Bryn Oer :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Pen Bryn Oer Wind Farm     4 MW
Energy Type: Wind Onshore
County: Mid Glamorgan     Country: Wales     LPA: Caerphilly County Borough Council
Site ID and Reference: 4412 / B0329     District:
Applicant: REG Windpower/ BlackRock     Application : 13/0483/FULL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 3 Turbine Capacity: 1.3300000000000001
Height of Turbines: Calculated capacity: 3.99
Site Address: Pen Bryn Oer, Merthyr Road, Rhymney
 
County: Mid Glamorgan Region: Wales
OS Coordinates: 312065 / 312065
Development Status: Operational
Application Submitted: 6/28/2013 Planning Permission Granted
Application Determined: Permission refused: 8/10/2014
Construction Date: 1/15/2017    
Generator Live 1/15/2018 This Record Last Updated: 5/29/2018
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 8/6/2018    
Secretary of State - Appeal Lodged: 7/8/2014
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 8/10/2014

 OFGEM Data on this Project: Pen Bryn Oer: Wind :

 Calculations


Capacity: 7.98
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/26/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 7.98 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 352704

Project Info
The final turbine has been erected at PEN BRYN OER
Jones Bros overcomes geotechnical challenges as PEN BRYN OER nears completion

PEN BRYN OER Wind Farm

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School