Far Marsh Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Far Marsh Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, HU12 0AN    
Type of installation: Wind    on/offshore: on
Turbines :3  Capacity : 7.5 MW
Approx Date of 1st power generation: January 2017

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

12/04962/STPLFE | Erection of three wind turbines (50m to hub, 77m to tip) for a period of 25 years with construction of an access track, substation and associated infrastructure (Resubmission of 11/05896/STPLFE) | Land North West Of Far Marsh Farm Marsh Road Ottringham East Riding Of Yorkshire HU12 0AN
The proposal is for the erection of three wind turbines and
the construction of a new access track and associated
infrastructure. Each turbine with have a maximum tip height of
up to 102m.

 Turbine Make and Specs

Model: Gamesa G58 Start Speed: 6
Capacity: 0.85 Optimal Speed: 13
Rotor Diameter: 58 Stop Speed: 24
Hub Height 75   Avg for all turbines:75 Avg. Elevation: 1
Web Page: http://www.gamesacorp.com/en/products-and-services/gamesa-g58-850-kw-en.html
Comment:

 Address

Marsh Road, Ottringham, Hull, Humberside

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Far Marsh )

 DECC Data on this Project: Far Marsh :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Far Marsh Farm     7.5 MW
Energy Type: Wind Onshore
County: Humberside     Country: England     LPA: East Riding of Yorkshire Council
Site ID and Reference: 4660 / IF1174     District:
Applicant: Private Developer     Application : 12/04962/STPLFE (Go to search to find Application)
For Wind Farms  
Number of Turbines: 3 Turbine Capacity: 2.5
Height of Turbines: Calculated capacity: 7.5
Site Address: Marsh Road, Ottringham, Hull,
  HU12 0AN
County: Humberside Region: Yorkshire and Humber
OS Coordinates: 524667 / 524667
Development Status: Operational
Application Submitted: 12/14/2012 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 10/15/2016    
Generator Live 1/15/2017 This Record Last Updated: 3/27/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Far Marsh: Wind :

 Calculations


Capacity: 15
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 24 m/s (53.688 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 1/15/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 15 start: 5 Optimum: 15/ Stop: 24 / wind: / ratio 352705

Project Info
Three new Wind Turbines approved near Ottringham
THREE 50m HIGH wind turbines are to be constructed just South of Ottringham (on land North West of FAR MARSH Farm, Marsh Road).

©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School