Page views this IP this session = 10 of 10 unsubscribed pagesOldbury Energy from Waste Plant
Oldbury (Waste , Active, Waste - EFW) Location in the UK : England, B69 3EL Type of installation: Waste on/offshore: on Turbines :0 Capacity : 40 MW Approx Date of 1st power generation: January 2014
/YES
DC/12/54866 | Development of an advanced recycling and electricity generation facility on former fuel depot/lorry park (DC/10/52897). Variation of condition 21 for the removal of numerical limit which states that daily average of nitrogen oxides (expressed as Nitrogen Dioxide) emitted from two stacks co-located in a 50 m high joint flue shall not exceed 100 milligrams per cubic metre as measured in accordance with the measurement methods for this substance detailed in the Environmental Permit issued in connection with this installation. Replacement with a requirement to provide Sandwell Council with air quality monitoring information to include: Air quality reports from the commissioning period Updated air quality modelling assessment using real time emission data once commissioning of the site has been completed. Continuous emissions data submitted to the Council at the same time as it is supplied to the Environment Agency, in an electronic format to be agreed with the Council. | NCP Vehicle Pound Mobile 6 Union Road Oldbury B69 3EL NCP Vehicle Compound, Union Road, Oldbury, West Midlands
Relationship |
Company (For:
Oldbury
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Oldbury 40 MW
|
Energy Type: |
Advanced Conversion Technologies |
County: |
West Midlands Country: England LPA: Sandwell Metropolitan Borough Council
|
Site ID and Reference: |
950 / AA409
District:
|
Applicant: |
IES (Chinook Energy)
Application :
DC/10/52897
|
(Go to search to find Application) |
Site Address: |
NCP Vehicle Compound, Union Road, Oldbury, West Midlands
|
|
B69 3EL
|
County: |
West Midlands Region: West Midlands
|
OS Coordinates: |
398141 / 398141
|
Development Status: |
Operational
|
Application Submitted: |
1/11/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
6/30/2012
|
|
|
Generator Live |
1/15/2014
|
This Record Last Updated: |
2/23/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|