Sorry I found no matches, Please try again. 176
vid = 5586pws_id = pws_id = Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.145.59.244 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Castledockrell Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Castledockrell Wind Farm (Wind , Active)

 General Information.

Location in the UK : s.ireland, enniscorthy wexford ireland    
Type of installation: Wind    on/offshore: on
Turbines :18  Capacity : 41.4 MW
Approx Date of 1st power generation: January 2011

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

 Turbine Make and Specs

Model: Enercon E82 Start Speed: 4
Capacity: 2 Optimal Speed: 13.5
Rotor Diameter: 82 Stop Speed: 31
Hub Height 80   Avg for all turbines:80 Avg. Elevation: 190
Web Page: http://www.enercon.de/en-en/62.htm
Comment: Gearless, variable speed, single blade adjustment. Start and Stop: Guesstimate

 Address

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Castledockrell )

 DECC Data on this Project: Castledockrell :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

 OFGEM Data on this Project: Castledockrell: Wind :

 Calculations


Capacity: 39.1
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 31 m/s (69.347 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/27/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 39.1 start: 5 Optimum: 15/ Stop: 31 / wind: / ratio

Project Info
Sorry I found no matches, Please try again.
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School