Hawton Wind Farm (Wind , Active) Location in the UK : England, NG24 3SD Type of installation: Wind on/offshore: on Turbines :3 Capacity : 7.5 MW Approx Date of 1st power generation: February 2017
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
11/01588/FULM | Erection of 3no wind turbines of height between 105m and 126.5m to tip and associated infrastructure including access tracks, 1 switchgear and control building with transformers and grid connection infrastructure, underground cabling, turbine foundations, crane hardstandings, 1 new access point and 1 meteorological mast. | Meteorological Mast Field 6597 SK480350 Cotham Road Hawton Nottinghamshire
Model: |
Nordex N100
|
Start Speed: |
5
|
Capacity: |
2.5
|
Optimal Speed: |
15
|
Rotor Diameter: |
100
|
Stop Speed: |
25
|
Hub Height |
81 Avg for all turbines:81
|
Avg. Elevation: |
14
|
Web Page: |
|
Comment: |
|
Hawton Wind Farm Cotham Lane Hawton Newark NG24 3SD England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Hawton Wind Farm 9 MW
|
Energy Type: |
Wind Onshore |
County: |
Nottinghamshire Country: England LPA: Newark and Sherwood District Council
|
Site ID and Reference: |
4532 / AA590
District:
|
Applicant: |
Temporis Capital
Application :
11/01588/FULM
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
3 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
7.5 |
Site Address: |
Cotham Road, Hawton, Nottinghamshire
|
|
NG24 3SD
|
County: |
Nottinghamshire Region: East Midlands
|
OS Coordinates: |
479589 / 479589
|
Development Status: |
Operational
|
Application Submitted: |
12/5/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
8/22/2012
|
Construction Date: |
9/16/2016
|
|
|
Generator Live |
3/16/2017
|
This Record Last Updated: |
10/31/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
9/29/2017 |
|
|
Secretary of State - |
Appeal Lodged: |
10/10/2012 |
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
8/22/2012 |
Site Name: |
Newark Windfarm
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00407RQEN
|
Capacity: |
5935
|
Status: |
Live
|
Accreditation Date: |
12/5/2011
|
|
|
Commission Date: |
2/21/2017
|
|
|
Applicant: |
Temporis Capital LLP
|
Applicant Address: |
Temporis Capital LLP
Berger House 36-38
London
W1J 5AE
England
|
Address: |
Hawton Wind Farm
Cotham Lane
Hawton
Newark
NG24 3SD
England
|
Site Name: |
Newark Windfarm
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G03028NWEN
|
Capacity: |
5935
|
Status: |
Live
|
Accreditation Date: |
12/5/2011
|
|
|
Commission Date: |
2/21/2017
|
|
|
Applicant: |
Temporis Capital LLP
|
Applicant Address: |
Temporis Capital LLP
Berger House 36-38
London
W1J 5AE
England
|
Address: |
Hawton Wind Farm
Cotham Lane
Hawton
Newark
NG24 3SD
England
|
|
Assumptions: Capacity: 5935kW 5.935 MW, Thus over the month Capacity * 720 hours per month = 4273.2 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/05/2018 | | | 946 | 15.94% | Issued | 01/04/2018 | | | 1467 | 24.72% | Issued | 01/03/2018 | | | 1898 | 31.98% | Issued | 01/02/2018 | | | 1584 | 26.69% | Issued | 01/01/2018 | | | 2377 | 40.05% | Issued | 01/12/2017 | | | 2086 | 35.15% | Issued | 01/11/2017 | | | 1903 | 32.06% | Issued | 01/10/2017 | | | 2154 | 36.29% | Issued | 01/09/2017 | | | 1257 | 21.18% | Issued | 01/08/2017 | | | 1191 | 20.07% | Issued | 01/07/2017 | | | 1011 | 17.03% | Issued | 01/06/2017 | | | 1540 | 25.95% | Issued | 01/05/2017 | | | 1019 | 17.17% | Issued | 01/04/2017 | | | 963 | 16.23% | Issued | 01/03/2017 | | | 713 | 12.01% | Issued |
|
Capacity: 15 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 1/15/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
Updated: Just how many solar projects beat the fast-track review? Ever since the first mention of the Fast Track Feed-in Tariff Review: how many projects will beat the August 1 cut-off? Langage Westmill HAWTON toyota marston Rhos-Y-Gilwen wheal jane jb wheaton hendra coombe
£54.4m funding package settled for solar investors Refinancing: Benbole (1.7MW), Cornwall; HAWTON (4.9MW), Nottinghamshire; Howton (5.0MW), Cornwall; Marston (4.5MW), Nottinghamshire; Sandhill (1.9MW), Somerset; and Wilburton (5.0MW), Cambridgeshire.
Two more solar farms go live Jul 2011 - 7,098 solar panels were installed by Thermavolt at a ten-acre site at Benbole, while a 5mw project at HAWTON Farm, consisting of 17,856 panels, has been built by Oskamera Solar Power Solutions UK.
Howton Farm Cornwall 7,098 solar panels were installed by Thermavolt at a ten-acre site at Benbole, while a 5mw project at HAWTON Farm, consisting of 17,856 panels, has been built by Oskamera Solar Power Solutions UK.
News by Type 7,098 solar panels were installed by Thermavolt at a ten-acre site at Benbole, while a 5mw project at HAWTON Farm, consisting of 17,856 panels, has been built by Oskamera Solar Power Solutions UK.
|
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|