Sorry I found no matches, Please try again. 176
vid = 5778pws_id = 0pws_id = 0 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.223.205.151 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Kilathmoy Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Kilathmoy Wind Farm (Wind , Active)

 General Information.

Location in the UK : S.Ireland, Knockanure ireland    
Type of installation: Wind    on/offshore: on
Turbines :7  Capacity : 23.1 MW
Approx Date of 1st power generation: 2019

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

 Turbine Make and Specs

Model: Nordex N100 3MW Start Speed: 4
Capacity: 3 Optimal Speed: 15
Rotor Diameter: 101 Stop Speed: 25
Hub Height 0   Avg for all turbines:0 Avg. Elevation: 88
Web Page:
Comment:

 Address

 Associated Companies.

Relationship Company (For: Kilathmoy )
DeveloperStatkraft
OwnerStatkraft
OperatorStatkraft

 DECC Data on this Project: Kilathmoy :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

 OFGEM Data on this Project: Kilathmoy: Wind :

 Calculations


Capacity: 23.1
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 1/2/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 23.1 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 0

Project Info
The Nordex Group supplies seven large turbines to Ireland
The 23.1 megawatt "KILATHMOY" wind farm is being built in county Kerry, near the border with Limerick, in the south-west of Ireland.

Norwegians let fly at KILATHMOY
Norwegian power company Statkraft has taken a final investment decision to build the 23MW KILATHMOY wind farm in Ireland, its first project in the country.

©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School