Page views this IP this session = 1 of 10 unsubscribed pagesWestereems Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Westereems Wind Farm (Wind , Active) Location in the UK : Holland, Eemshaven Netherlands Type of installation: Wind on/offshore: on Turbines :88 Capacity : 264 MW Approx Date of 1st power generation: March 2009
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Model: |
Enercon E82
|
Start Speed: |
4
|
Capacity: |
2
|
Optimal Speed: |
13.5
|
Rotor Diameter: |
82
|
Stop Speed: |
31
|
Hub Height |
100 Avg for all turbines:100
|
Avg. Elevation: |
0
|
Web Page: |
http://www.enercon.de/en-en/62.htm |
Comment: |
Gearless, variable speed, single blade adjustment. Start and Stop: Guesstimate
|
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Capacity: 174 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 31 m/s (69.347 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 3/25/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
A new tower every five days On the Dutch North Sea coast, at the WESTEREEMS wind farm, the energy supplier Essent is currently implementing one of Europe’s largest repowering projects. A total of 88 new wind turbines are going up at Dollart Bay.
|
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|