Loading
Page views this IP this session = 1 of 10 unsubscribed pagesBjerkreim Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Bjerkreim Wind Farm (Wind , Active) Location in the UK : Norway, Bjerkreim Norway Type of installation: Wind on/offshore: on Turbines :70 Capacity : 294 MW Approx Date of 1st power generation: December 2019
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Model: |
Siemens SWT 130
|
Start Speed: |
3
|
Capacity: |
4.2
|
Optimal Speed: |
15
|
Rotor Diameter: |
130
|
Stop Speed: |
22
|
Hub Height |
125 Avg for all turbines:125
|
Avg. Elevation: |
0
|
Web Page: |
|
Comment: |
|
Relationship |
Company (For:
Bjerkreim
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Capacity: 294 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 22 m/s (49.214 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 12/21/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
Map of Wind Farm The installation of the 76MW-Skinansfjellet project, the 63MW-Gravdal wind farm and the Eikeland-Steinsland project with over 155 megawatts – a combined rating of 294 MW and collectively known as the BJERKREIM cluster
Facebook to add 294 MW of new wind capacity BJERKREIM Facebook and European asset manager Luxcara (PPAs) for 100% of the output and environmental (green) attributes of three contiguous wind projects (Gravdal, Skinansfjellet, and Eikeland-Steinsland) in southwest Norway.
|
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|