Bjerkreim Wind Farm (Wind , Active) Location in the UK : Norway, Bjerkreim Norway Type of installation: Wind on/offshore: on Turbines :70 Capacity : 294 MW Approx Date of 1st power generation: December 2019
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Model: |
Siemens SWT 130
|
Start Speed: |
3
|
Capacity: |
4.2
|
Optimal Speed: |
15
|
Rotor Diameter: |
130
|
Stop Speed: |
22
|
Hub Height |
125 Avg for all turbines:125
|
Avg. Elevation: |
0
|
Web Page: |
|
Comment: |
|
Relationship |
Company (For:
Bjerkreim
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Capacity: 294 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 22 m/s (49.214 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 1/2/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
Map of Wind Farm The installation of the 76MW-Skinansfjellet project, the 63MW-Gravdal wind farm and the Eikeland-Steinsland project with over 155 megawatts – a combined rating of 294 MW and collectively known as the BJERKREIM cluster
Facebook to add 294 MW of new wind capacity BJERKREIM Facebook and European asset manager Luxcara (PPAs) for 100% of the output and environmental (green) attributes of three contiguous wind projects (Gravdal, Skinansfjellet, and Eikeland-Steinsland) in southwest Norway.
|
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|