Loading
Page views this IP this session = 1 of 5 unsubscribed pagesHarbaksfjellet Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Harbaksfjellet Wind Farm (Wind , Agreed/Planning) Location in the UK : Norway, Afjorf norway Type of installation: Wind on/offshore: on Turbines :30 Capacity : 108 MW Approx Date of 1st power generation: 2020
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Model: |
Vestas V112
|
Start Speed: |
3
|
Capacity: |
3.3
|
Optimal Speed: |
13
|
Rotor Diameter: |
112
|
Stop Speed: |
25
|
Hub Height |
87 Avg for all turbines:
|
Avg. Elevation: |
|
Web Page: |
http://www.vestas.com/en/products_and_services/turbines/v112-3_3_mw |
Comment: |
The V112-3.3 MW™ IEC IB is a high-wind turbine and has a very high capacity factor. Similar to the other 3 MW turbines, the V112-3.3 MW™ IEC IB turbine makes efficient use of its grid compatibility and is an optimal choice for sites with MW constraints.
|
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|