Click here for Generation Forecast for wind farms based on Met office data
Asen Wind Farm (Wind , Active) Location in the UK : Norway, Lyefjell Type of installation: Wind on/offshore: on Turbines :3 Capacity : 1.6 MW Approx Date of 1st power generation: 2010
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Missing turbine is Vestas V20/100 HH 21 comm: 2004/4
Model: |
Enercon E48
|
Start Speed: |
5
|
Capacity: |
0.8
|
Optimal Speed: |
15
|
Rotor Diameter: |
48
|
Stop Speed: |
25
|
Hub Height |
56 Avg for all turbines:56
|
Avg. Elevation: |
0
|
Web Page: |
http://www.enercon.de/en-en/492.htm |
Comment: |
Hub height: 50 m / 55 m / 60 m / 76 m
Stated as being ideal machine for any site
|
Relationship |
Company (For:
Asen
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Capacity: 1.6 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 1/30/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
RAF Desborough: Solar farm plan for ex-WW2 airbase Northfield UK Solar's subsidiary company RAF Desb plans to install the panels on a 276 acre (112 hectare) site at RAF Desborough.
The firm aims to generate electricity for about 15,000 homes per year.
Sun may shine on solar farms after all! The RASEN Mail can reveal that a company called Market RASEN Solar Farm Ltd has been registered, which is seeking potential sites in the RASEN area. The directors are Toddington Harper and Duncan Bott, who are also directors of Belectric UK.
|
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|