Loading
Page views this IP this session = 1 of 10 unsubscribed pagesMehuken II Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Mehuken II Wind Farm (Wind , Active) Location in the UK : Norway, Type of installation: Wind on/offshore: on Turbines :8 Capacity : 18.4 MW Approx Date of 1st power generation:
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Model: |
Enercon E70
|
Start Speed: |
4
|
Capacity: |
2.3
|
Optimal Speed: |
13.5
|
Rotor Diameter: |
71
|
Stop Speed: |
31
|
Hub Height |
64 Avg for all turbines:64
|
Avg. Elevation: |
0
|
Web Page: |
http://www.enercon.de/en-en/61.htm |
Comment: |
Gearless, variable speed, single blade adjustment. Start and Stop: Guesstimate
|
Relationship |
Company (For:
Mehuken II
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Capacity: 32.2 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 31 m/s (69.347 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 12/30/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
Sorry I found no matches, Please try again.
|
|
©2018
Simon Mallett |
Latest News Added |
Turbine installation underway at Scots wind farm
Source: renews, Date and Time of entry: Sunday, December 29, 2024 00:00
Port of Ayr: Wind turbines delivered to power 5,600 homes Twenty-four turbine blades and the section pieces for eight towers were recently unloaded at the port.
They're bound for the Kirk Hill wind farm Date and Time of entry: Sunday, December 29, 2024 00:00
Our second people-owned wind farm Made up of 8 turbines in windy west Scotland, Kirk Hill can power over 20,000 households and businesses with the cheapest and greenest electricity. Source: ripple, Date and Time of entry: Sunday, December 29, 2024 00:00
Hendy Wind Farm Powersystems awarded the electrical works for 16.1 MW Hendy Wind Farm Date and Time of entry: Saturday, December 28, 2024 00:00
SSE announces construction of Aberarder Wind Farm SSE has taken a final investment decision to proceed with Aberarder Wind Farm in the Scottish Highlands, in a circa £100m investment boost for its onshore wind portfolio. Source: sse, Date and Time of entry: Saturday, December 28, 2024 00:00
|
|
©2017
Simon Mallett |
|