Sorry I found no matches, Please try again. 176
vid = 5976pws_id = 3903pws_id = 3903 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.145.45.223 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Curraghamulkin Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Curraghamulkin Wind Farm (Wind , Deleted)

 General Information.

Location in the UK : N.Ireland, dooish co. tyrone    
Type of installation: Wind    on/offshore: on
Turbines :10  Capacity : 30 MW
Approx Date of 1st power generation: July 2018

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

 Turbine Make and Specs

Model: 2B6 Start Speed: 3.5
Capacity: 6 Optimal Speed: 13
Rotor Diameter: 140 Stop Speed: 0
Hub Height 0   Avg for all turbines: Avg. Elevation:
Web Page: https://en.wind-turbine-models.com/turbines/1250-2-b-energy-2b6
Comment:

 Address

Coolavannagh TD, Curraghmulkin TD, Dooish TD, Drumquin

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Curraghamulkin )

 DECC Data on this Project: Curraghamulkin :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Curraghamulkin (Dooish Wind Farm)     30 MW
Energy Type: Wind Onshore
County: Co. Tyrone     Country: Northern Ireland     LPA: Northern Ireland Planning Service
Site ID and Reference: 4151 / A0309     District:
Applicant: DW Consultancy     Application : K/2008/0334/F (Go to search to find Application)
For Wind Farms  
Number of Turbines: 10 Turbine Capacity: 3
Height of Turbines: 130 Calculated capacity: 30
Site Address: Coolavannagh TD, Curraghmulkin TD, Dooish TD, Drumquin
 
County: Co. Tyrone Region: Northern Ireland
OS Coordinates: 43843 / 43843
Development Status: Operational
Application Submitted: 3/12/2008 Planning Permission Granted
Application Determined: Permission refused: 1/25/2016
Construction Date: 1/15/2018    
Generator Live 7/15/2018 This Record Last Updated: 10/30/2018
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged: 1/22/2016
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 1/25/2016

 OFGEM Data on this Project: Curraghamulkin: Wind :

 Calculations



Alternative Wind Speed: in mph Capacity: 1 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 3903

Project Info
Green light for £37m Co Tyrone wind farm a decade after plans first drawn
The wind farm will see 10 turbines, each 125 metres tall, being built at CURRAGHAMULKIN in Co Tyrone.

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School