Page views this IP this session = 1 of 10 unsubscribed pagesWalney Extension Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Walney Extension Wind Farm (Wind , Active) Location in the UK : England, LA3 3JJ Type of installation: Wind on/offshore: off Turbines :79 Capacity : 553 MW Approx Date of 1st power generation:
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Model: |
Vestas V164-8MW
|
Start Speed: |
0
|
Capacity: |
8
|
Optimal Speed: |
0
|
Rotor Diameter: |
164
|
Stop Speed: |
0
|
Hub Height |
105 Avg for all turbines:104
|
Avg. Elevation: |
-81
|
Web Page: |
https://en.wikipedia.org/wiki/Vestas_V164 |
Comment: |
MHI VESTAS on the Isle of Wight has been selected as the preferred turbine supplier for the proposed Navitus Bay offshore wind farm.
The turbines’ 80m long blades will be made at the company’s factory, supporting the 200 local jobs currently being created there.
MHI Vestas will supply its latest V164-8MW wind turbine.
|
Walney Offshore Windfarm Phase I Near Walney Island LA3 3JJ England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Walney 3 659 MW
|
Energy Type: |
Wind Offshore |
County: |
Offshore Country: England LPA: DECC (S36)
|
Site ID and Reference: |
2533 / A0374
District:
|
Applicant: |
Orsted (formerly Dong Energy)
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
110 |
Turbine Capacity: |
6 |
Height of Turbines: |
222 |
Calculated capacity: |
660 |
Site Address: |
14km off Walney Island, Irish Sea
|
|
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
286289 / 286289
|
Development Status: |
Operational
|
Application Submitted: |
7/30/2013
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
4/1/2017
|
|
|
Generator Live |
9/13/2018
|
This Record Last Updated: |
6/4/2020
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
11/7/2019 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Walney Extension
|
Generator Type: |
Off-shore wind (REGO code = FW)
|
Scheme : |
REGO
|
Generator ID: |
G01177FWEN
|
Capacity: |
648000
|
Status: |
Live
|
Accreditation Date: |
7/30/2013
|
|
|
Commission Date: |
9/2/2017
|
|
|
Applicant: |
DONG Energy Walney Extension (UK) Ltd.
|
Applicant Address: |
c/o DONG Energy Wind A/S
Nesa Allé 1
Gentofte
2820
Overseas - Denmark
|
Address: |
Cavendish Dock Road
Barrow-in-Furness
Cumbria
LA14 2GR
England
|
|
Assumptions: Capacity: 648000kW 648 MW, Thus over the month Capacity * 720 hours per month = 466560 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
| | | 101425 | 15.65% | Issued | | | | 11269 | 1.74% | Issued | | | | 109939 | 16.97% | Issued |
|
Capacity: 1106 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 0 m/s (0 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 12/27/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|