Loading
Page views this IP this session = 1 of 10 unsubscribed pagesHornsea 2
Hornsea 2 (Windoff , Active) Location in the UK : England, North Sea Offshore Yorkshire Type of installation: Windoff on/offshore: off Turbines :165 Capacity : 1400 MW Approx Date of 1st power generation:
/YES
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Hornsea 2 - Optimus and Breesea 1320 MW
|
Energy Type: |
Wind Offshore |
County: |
Offshore Country: England LPA: The Planning Inspectorate - National Infrastructure
|
Site ID and Reference: |
2502 / A0249
District:
|
Applicant: |
Orsted (formerly Dong Energy)
Application :
EN010053
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
165 |
Turbine Capacity: |
8 |
Height of Turbines: |
|
Calculated capacity: |
1320 |
Site Address: |
The Wash, Sutton Bridge
|
|
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
632326 / 632326
|
Development Status: |
Operational
|
Application Submitted: |
1/30/2015
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
9/1/2019
|
|
|
Generator Live |
8/31/2022
|
This Record Last Updated: |
9/1/2022
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Nine offshore wind farm projects awarded in UK auction The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|