Loading
Page views this IP this session = 1 of 10 unsubscribed pagesBlyth Harbour Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Blyth Harbour Wind Farm (Wind , Active) Location in the UK : England, Northumberland Type of installation: Wind on/offshore: on Turbines :9 Capacity : 2.7 MW Approx Date of 1st power generation: January 1993
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Blyth Harbour Wind Farm was one of the first wind farms to be built in England. In 1993 it was a far sighted local initiative which established Wansbeck, Blyth Valley and the North East at the forefront of the development of renewable energy long before the threats of global warming and climate change were widely recognised.
July 2008: The world’s two most powerful wind turbines, with blades up to 500ft in diameter, are to be built on the Northumberland coast in clear view of northeast England’s most renowned shorelines.
The 9 turbines have now been replaced with a single 3.4MW REPower turbine, largest onshore wind turbine in the UK.
Three further 3.4M104 turbines are set to be erected as part of a second repowering phase at Blyth Harbour. The re-development has been described as vital to securing future investment in the Port of Blyth.
Model: |
WEG MS3 300
|
Start Speed: |
0
|
Capacity: |
0.3
|
Optimal Speed: |
0
|
Rotor Diameter: |
33
|
Stop Speed: |
0
|
Hub Height |
55 Avg for all turbines:55
|
Avg. Elevation: |
1
|
Web Page: |
|
Comment: |
Wind Energy Group Ltd MS3-300, 2 bladed Turbine
|
Blyth Harbour North Blyth Cambois Bedlington Northumberland NE24 1SE England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Blyth Harbour Wind Farm (re-power) 3.4 MW
|
Energy Type: |
Wind Onshore |
County: |
Northumberland Country: England LPA: Northumberland County Council
|
Site ID and Reference: |
4663 / EN00093
District:
|
Applicant: |
Hainsford Energy
Application :
07/00287/FULES
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
1 |
Turbine Capacity: |
3.3999999999999999 |
Height of Turbines: |
|
Calculated capacity: |
3.4 |
Site Address: |
Blyth Harbour, North Blyth, Cambois, Bedlington, Northumberland
|
|
|
County: |
Northumberland Region: North East
|
OS Coordinates: |
432585 / 432585
|
Development Status: |
Operational
|
Application Submitted: |
7/6/2007
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
6/1/2011
|
|
|
Generator Live |
9/1/2012
|
This Record Last Updated: |
12/2/2014
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Blyth Harbour Wind Farm 2.7 MW
|
Energy Type: |
Wind Onshore |
County: |
Northumberland Country: England LPA: Northumberland County Council
|
Site ID and Reference: |
3659 / 06017W4
District:
|
Applicant: |
Border Wind Farms Ltd
Application :
91/00011/181OTH
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
9 |
Turbine Capacity: |
0.29999999999999999 |
Height of Turbines: |
|
Calculated capacity: |
2.7 |
Site Address: |
Blyth Harbour
North Blyth
Cambois
Bedlington
Northumberland
|
|
|
County: |
Northumberland Region: North East
|
OS Coordinates: |
432290 / 432290
|
Development Status: |
Operational
|
Application Submitted: |
5/23/1991
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
12/1/1992
|
This Record Last Updated: |
10/8/2013
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Blyth Harbour Wind Farm - A
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00062RQEN
|
Capacity: |
3335
|
Status: |
Live
|
Accreditation Date: |
5/23/1991
|
|
|
Commission Date: |
12/1/1992
|
|
|
Applicant: |
Hainsford Energy (Wansbeck Blyth Harbour) Limited
|
Applicant Address: |
Hainsford Energy Ltd
PO Box 27
Tunbridge Wells
Kent
TN3 0YP
England
|
Address: |
Blyth Harbour Wind Farm
East PierBlyth HarbourNorthumberland
North Blyth (Nr. Rio Tinto Alcan SUF)
Cambois
NE24 1SE
England
|
Site Name: |
Blyth Harbour Wind Farm - A
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G00994NWEN
|
Capacity: |
3335
|
Status: |
Live
|
Accreditation Date: |
5/23/1991
|
|
|
Commission Date: |
12/1/1992
|
|
|
Applicant: |
Hainsford Energy (Wansbeck Blyth Harbour) Limited
|
Applicant Address: |
Hainsford Energy Ltd
PO Box 27
Tunbridge Wells
Kent
TN3 0YP
England
|
Address: |
Blyth Harbour Wind Farm
East PierBlyth HarbourNorthumberland
North Blyth (Nr. Rio Tinto Alcan SUF)
Cambois
NE24 1SE
England
|
|
Assumptions: Capacity: 3335kW 3.335 MW, Thus over the month Capacity * 720 hours per month = 2401.2 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/04/2018 | | | 809 | 24.26% | Issued | 01/03/2018 | | | 1195 | 35.83% | Issued | 01/02/2018 | | | 881 | 26.42% | Issued | 01/01/2018 | | | 1178 | 35.32% | Issued | 01/12/2017 | | | 1061 | 31.81% | Retired | 01/11/2017 | | | 1005 | 30.13% | Retired | 01/10/2017 | | | 964 | 28.91% | Retired | 01/09/2017 | | | 733 | 21.98% | Retired | 01/08/2017 | | | 640 | 19.19% | Issued | 01/07/2017 | | | 579 | 17.36% | Issued | 01/06/2017 | | | 875 | 26.24% | Retired | 01/05/2017 | | | 639 | 19.16% | Issued | 01/04/2017 | | | 740 | 22.19% | Issued | 01/03/2017 | | | 784 | 23.51% | Issued | 01/02/2017 | | | 1060 | 31.78% | Issued | 01/01/2017 | | | 872 | 26.15% | Issued | Dec-16 | 0 | 878 | 878 | 26.33% | Pending Tr | Nov-16 | 0 | 681 | 681 | 20.42% | Pending Tr | Oct-16 | 0 | 693 | 692 | 20.75% | Pending Tr | Sep-16 | 0 | 703 | 702 | 21.05% | Pending Tr | Aug-16 | 0 | 709 | 709 | 21.26% | Pending Tr | Jul-16 | 0 | 586 | 590 | 17.69% | Pending Tr | Jul-16 | 0 | 586 | 590 | 17.69% | Pending Tr | Jun-16 | 0 | 488 | 488 | 14.63% | Pending Tr | May-16 | 0 | 744 | 745 | 22.34% | Pending Tr | Apr-16 | 0 | 734 | 739 | 22.16% | Pending Tr | Mar-16 | 0 | 667 | 667 | 20.00% | Redeemed | Feb-16 | 0 | 774 | 775 | 23.24% | Redeemed | Jan-16 | 0 | 1196 | 1196 | 35.86% | Redeemed | Dec-15 | 0 | 1205 | 1205 | 36.13% | Redeemed | Nov-15 | 0 | 1080 | 1081 | 32.41% | Redeemed | Oct-15 | 0 | 554 | 558 | 16.73% | Redeemed | Sep-15 | 0 | 506 | 506 | 15.17% | Redeemed | Aug-15 | 0 | 592 | 592 | 17.75% | Issued | Jul-15 | 650 | 651 | 210 | 6.30% | Redeemed | Jun-15 | 672 | 671 | 671 | 20.12% | Redeemed | May-15 | 871 | 871 | 871 | 26.12% | Redeemed | Apr-15 | 597 | 593 | 598 | 17.93% | Redeemed | Mar-15 | 1028 | 1028 | 1028 | 30.82% | Expired | Feb-15 | 952 | 952 | 952 | 28.55% | Redeemed | Jan-15 | 1229 | 1229 | 1229 | 36.85% | Redeemed | Dec-14 | 1109 | 1109 | 1109 | 33.25% | Redeemed | Nov-14 | 810 | 810 | 810 | 24.29% | Redeemed | Oct-14 | 1024 | 1025 | 5 | 0.15% | Redeemed | Sep-14 | 299 | 298 | 298 | 8.94% | Redeemed | Aug-14 | 772 | 773 | 773 | 23.18% | Redeemed | Jul-14 | 365 | 362 | 364 | 10.91% | Redeemed | Jun-14 | 278 | 276 | 278 | 8.34% | Redeemed | May-14 | 598 | 598 | 598 | 17.93% | Redeemed | Apr-14 | 659 | 659 | 659 | 19.76% | Redeemed | Mar-14 | 846 | 846 | 846 | 25.37% | Expired | Feb-14 | 1245 | 1244 | 1244 | 37.30% | Redeemed | Jan-14 | 1104 | 1104 | 1104 | 33.10% | Redeemed | Dec-13 | 1442 | 1443 | 1443 | 43.27% | Redeemed | Nov-13 | 856 | 855 | 855 | 25.64% | Redeemed | Oct-13 | 1319 | 1320 | 1319 | 39.55% | Expired | Sep-13 | 742 | 742 | 742 | 22.25% | Redeemed | Aug-13 | 514 | 514 | 514 | 15.41% | Redeemed | Jul-13 | 346 | 343 | 346 | 10.37% | Redeemed | Jun-13 | 414 | 414 | 415 | 12.44% | Expired | May-13 | 919 | 919 | 919 | 27.56% | Redeemed | Apr-13 | 966 | 966 | 965 | 28.94% | Redeemed | Mar-13 | 1197 | 1197 | 1197 | 35.89% | Expired | Feb-13 | 944 | 945 | 944 | 28.31% | Expired | Jan-13 | 1009 | 1009 | 1009 | 30.25% | Redeemed | Dec-12 | 1151 | 1151 | 1151 | 34.51% | Redeemed | Nov-12 | 903 | 903 | 903 | 27.08% | Redeemed | Oct-12 | 562 | 560 | 562 | 16.85% | Redeemed | Sep-12 | 236 | 234 | 236 | 7.08% | Redeemed | Jun-12 | 10 | 4 | 10 | 0.30% | Redeemed | May-12 | 27 | 21 | 27 | 0.81% | Redeemed | Apr-12 | 63 | 58 | 63 | 1.89% | Redeemed | Mar-12 | 9 | 2 | 15 | 0.45% | Redeemed | Feb-12 | 42 | 37 | 42 | 1.26% | Redeemed | Jan-12 | 27 | 21 | 27 | 0.81% | Redeemed | Dec-11 | 28 | 23 | 29 | 0.87% | Redeemed | Nov-11 | 43 | 37 | 43 | 1.29% | Redeemed | Oct-11 | 53 | 47 | 53 | 1.59% | Redeemed | Sep-11 | 38 | 33 | 38 | 1.14% | Redeemed | Aug-11 | 11 | 5 | 11 | 0.33% | Redeemed | Jul-11 | 5 | 0 | 5 | 0.15% | Redeemed | Jun-11 | 6 | 0 | 6 | 0.18% | Redeemed | May-11 | 22 | 17 | 22 | 0.66% | Redeemed | Apr-11 | 15 | 10 | 15 | 0.45% | Redeemed | Mar-11 | 20 | 12 | 19 | 0.57% | Redeemed | Feb-11 | 77 | 73 | 78 | 2.34% | Redeemed | Jan-11 | 52 | 45 | 52 | 1.56% | Redeemed | Dec-10 | 59 | 52 | 59 | 1.77% | Redeemed | Nov-10 | 189 | 184 | 189 | 5.67% | Redeemed |
|
Capacity: 5.4 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 0 m/s (0 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 11/23/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|