Blyth Harbour Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Blyth Harbour Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Northumberland    
Type of installation: Wind    on/offshore: on
Turbines :9  Capacity : 2.7 MW
Approx Date of 1st power generation: January 1993

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Blyth Harbour Wind Farm was one of the first wind farms to be built in England. In 1993 it was a far sighted local initiative which established Wansbeck, Blyth Valley and the North East at the forefront of the development of renewable energy long before the threats of global warming and climate change were widely recognised.

July 2008: The world’s two most powerful wind turbines, with blades up to 500ft in diameter, are to be built on the Northumberland coast in clear view of northeast England’s most renowned shorelines.

The 9 turbines have now been replaced with a single 3.4MW REPower turbine, largest onshore wind turbine in the UK.

Three further 3.4M104 turbines are set to be erected as part of a second repowering phase at Blyth Harbour. The re-development has been described as vital to securing future investment in the Port of Blyth.

 Turbine Make and Specs

Model: WEG MS3 300 Start Speed: 0
Capacity: 0.3 Optimal Speed: 0
Rotor Diameter: 33 Stop Speed: 0
Hub Height 55   Avg for all turbines:55 Avg. Elevation: 1
Web Page:
Comment: Wind Energy Group Ltd MS3-300, 2 bladed Turbine

 Address

Blyth Harbour North Blyth Cambois Bedlington Northumberland NE24 1SE England

 Associated Companies.

Relationship Company (For: Blyth Harbour )
DeveloperAMEC
OwnerHainsford Energy
OperatorHainsford Energy

 DECC Data on this Project: Blyth Harbour :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Blyth Harbour Wind Farm (re-power)     3.4 MW
Energy Type: Wind Onshore
County: Northumberland     Country: England     LPA: Northumberland County Council
Site ID and Reference: 4663 / EN00093     District:
Applicant: Hainsford Energy     Application : 07/00287/FULES (Go to search to find Application)
For Wind Farms  
Number of Turbines: 1 Turbine Capacity: 3.3999999999999999
Height of Turbines: Calculated capacity: 3.4
Site Address: Blyth Harbour, North Blyth, Cambois, Bedlington, Northumberland
 
County: Northumberland Region: North East
OS Coordinates: 432585 / 432585
Development Status: Operational
Application Submitted: 7/6/2007 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 6/1/2011    
Generator Live 9/1/2012 This Record Last Updated: 12/2/2014
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Blyth Harbour Wind Farm     2.7 MW
Energy Type: Wind Onshore
County: Northumberland     Country: England     LPA: Northumberland County Council
Site ID and Reference: 3659 / 06017W4     District:
Applicant: Border Wind Farms Ltd     Application : 91/00011/181OTH (Go to search to find Application)
For Wind Farms  
Number of Turbines: 9 Turbine Capacity: 0.29999999999999999
Height of Turbines: Calculated capacity: 2.7
Site Address: Blyth Harbour North Blyth Cambois Bedlington Northumberland
 
County: Northumberland Region: North East
OS Coordinates: 432290 / 432290
Development Status: Operational
Application Submitted: 5/23/1991 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 12/1/1992 This Record Last Updated: 10/8/2013
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Blyth Harbour: Wind :

Site Name: Blyth Harbour Wind Farm - A
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00062RQEN
Capacity: 3335 Status: Live
Accreditation Date: 5/23/1991    
Commission Date: 12/1/1992    
Applicant: Hainsford Energy (Wansbeck Blyth Harbour) Limited
Applicant Address: Hainsford Energy Ltd PO Box 27 Tunbridge Wells Kent TN3 0YP England
Address: Blyth Harbour Wind Farm East PierBlyth HarbourNorthumberland North Blyth (Nr. Rio Tinto Alcan SUF) Cambois NE24 1SE England

Site Name: Blyth Harbour Wind Farm - A
Generator Type: Wind
Scheme : REGO Generator ID: G00994NWEN
Capacity: 3335 Status: Live
Accreditation Date: 5/23/1991    
Commission Date: 12/1/1992    
Applicant: Hainsford Energy (Wansbeck Blyth Harbour) Limited
Applicant Address: Hainsford Energy Ltd PO Box 27 Tunbridge Wells Kent TN3 0YP England
Address: Blyth Harbour Wind Farm East PierBlyth HarbourNorthumberland North Blyth (Nr. Rio Tinto Alcan SUF) Cambois NE24 1SE England
 
Assumptions: Capacity: 3335kW 3.335 MW,
Thus over the month Capacity * 720 hours per month = 2401.2 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 809 24.26% Issued
01/03/2018 1195 35.83% Issued
01/02/2018 881 26.42% Issued
01/01/2018 1178 35.32% Issued
01/12/2017 1061 31.81% Retired
01/11/2017 1005 30.13% Retired
01/10/2017 964 28.91% Retired
01/09/2017 733 21.98% Retired
01/08/2017 640 19.19% Issued
01/07/2017 579 17.36% Issued
01/06/2017 875 26.24% Retired
01/05/2017 639 19.16% Issued
01/04/2017 740 22.19% Issued
01/03/2017 784 23.51% Issued
01/02/2017 1060 31.78% Issued
01/01/2017 872 26.15% Issued
Dec-16 0878 878 26.33% Pending Tr
Nov-16 0681 681 20.42% Pending Tr
Oct-16 0693 692 20.75% Pending Tr
Sep-16 0703 702 21.05% Pending Tr
Aug-16 0709 709 21.26% Pending Tr
Jul-16 0586 590 17.69% Pending Tr
Jul-16 0586 590 17.69% Pending Tr
Jun-16 0488 488 14.63% Pending Tr
May-16 0744 745 22.34% Pending Tr
Apr-16 0734 739 22.16% Pending Tr
Mar-16 0667 667 20.00% Redeemed
Feb-16 0774 775 23.24% Redeemed
Jan-16 01196 1196 35.86% Redeemed
Dec-15 01205 1205 36.13% Redeemed
Nov-15 01080 1081 32.41% Redeemed
Oct-15 0554 558 16.73% Redeemed
Sep-15 0506 506 15.17% Redeemed
Aug-15 0592 592 17.75% Issued
Jul-15 650651 210 6.30% Redeemed
Jun-15 672671 671 20.12% Redeemed
May-15 871871 871 26.12% Redeemed
Apr-15 597593 598 17.93% Redeemed
Mar-15 10281028 1028 30.82% Expired
Feb-15 952952 952 28.55% Redeemed
Jan-15 12291229 1229 36.85% Redeemed
Dec-14 11091109 1109 33.25% Redeemed
Nov-14 810810 810 24.29% Redeemed
Oct-14 10241025 5 0.15% Redeemed
Sep-14 299298 298 8.94% Redeemed
Aug-14 772773 773 23.18% Redeemed
Jul-14 365362 364 10.91% Redeemed
Jun-14 278276 278 8.34% Redeemed
May-14 598598 598 17.93% Redeemed
Apr-14 659659 659 19.76% Redeemed
Mar-14 846846 846 25.37% Expired
Feb-14 12451244 1244 37.30% Redeemed
Jan-14 11041104 1104 33.10% Redeemed
Dec-13 14421443 1443 43.27% Redeemed
Nov-13 856855 855 25.64% Redeemed
Oct-13 13191320 1319 39.55% Expired
Sep-13 742742 742 22.25% Redeemed
Aug-13 514514 514 15.41% Redeemed
Jul-13 346343 346 10.37% Redeemed
Jun-13 414414 415 12.44% Expired
May-13 919919 919 27.56% Redeemed
Apr-13 966966 965 28.94% Redeemed
Mar-13 11971197 1197 35.89% Expired
Feb-13 944945 944 28.31% Expired
Jan-13 10091009 1009 30.25% Redeemed
Dec-12 11511151 1151 34.51% Redeemed
Nov-12 903903 903 27.08% Redeemed
Oct-12 562560 562 16.85% Redeemed
Sep-12 236234 236 7.08% Redeemed
Jun-12 104 10 0.30% Redeemed
May-12 2721 27 0.81% Redeemed
Apr-12 6358 63 1.89% Redeemed
Mar-12 92 15 0.45% Redeemed
Feb-12 4237 42 1.26% Redeemed
Jan-12 2721 27 0.81% Redeemed
Dec-11 2823 29 0.87% Redeemed
Nov-11 4337 43 1.29% Redeemed
Oct-11 5347 53 1.59% Redeemed
Sep-11 3833 38 1.14% Redeemed
Aug-11 115 11 0.33% Redeemed
Jul-11 50 5 0.15% Redeemed
Jun-11 60 6 0.18% Redeemed
May-11 2217 22 0.66% Redeemed
Apr-11 1510 15 0.45% Redeemed
Mar-11 2012 19 0.57% Redeemed
Feb-11 7773 78 2.34% Redeemed
Jan-11 5245 52 1.56% Redeemed
Dec-10 5952 59 1.77% Redeemed
Nov-10 189184 189 5.67% Redeemed

 Calculations


Capacity: 5.4
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 0 m/s (0 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/21/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 5.4 start: 5 Optimum: 15/ Stop: 0 / wind: / ratio 354005

Project Info
Giant turbines to make north Windy Central - Times

BLYTH HARBOUR Wind Farm

Port of Blyth - Wind Industry

UK’s most powerful onshore turbine starts turning at BLYTH HARBOUR Wind Farm
REpower’s 3.4M104 turbine, which has a rated power of 3.4 megawatts and a rotor diameter of 104 metres, has begun operating at the Hainsford Energy’s BLYTH HARBOUR Wind Farm in Northumberland as the first phase of repowering the 20-year old site.

Huge replacement wind turbines planned for BLYTH HARBOUR
SOME of the biggest and most powerful onshore wind turbines built in the UK so far are being lined up for the Northumberland coastline in a project to re-power one of the country’s oldest wind farms.

©2018 Simon Mallett
Latest News Added
Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Nine offshore wind farm projects awarded in UK auction
The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School