Common Barn Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Common Barn Wind Farm (Wind , Active)

 General Information.

Location in the UK : England,    
Type of installation: Wind    on/offshore: on
Turbines :3  Capacity : 6.15 MW
Approx Date of 1st power generation: May 2019

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Consented. Contract for Difference (CFD) awarded in early 2015, project currently in construction expected to achieve commercial operation in first quarter 2019

 Turbine Make and Specs

Model: Senvion MM92 Start Speed: 4
Capacity: 2 Optimal Speed: 12
Rotor Diameter: 92 Stop Speed: 25
Hub Height 80   Avg for all turbines:80 Avg. Elevation: 40
Web Page: http://www.repower.de/wind-power-solutions/wind-turbines/5m/
Comment: The reliable gearbox and generator technology of the MM82 is also the basis for the MM92 wind power plants.

 Address

Church Farm, Southoe, Huntingdonshire

 Associated Companies.

Relationship Company (For: Common Barn )
OwnerTCI Renewables
OperatorTCI Renewables
DeveloperTCI Renewables

 DECC Data on this Project: Common Barn :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Common Barn Wind Farm     6.2 MW
Energy Type: Wind Onshore
County: Cambridgeshire     Country: England     LPA: Huntingdonshire District Council
Site ID and Reference: 4076 / AA522     District:
Applicant: TCI Renewables     Application : 1200803FUL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 3 Turbine Capacity: 3
Height of Turbines: Calculated capacity: 9
Site Address: Church Farm, Southoe, Huntingdonshire
 
County: Cambridgeshire Region: Eastern
OS Coordinates: 516918 / 516918
Development Status: Operational
Application Submitted: 5/15/2012 Planning Permission Granted
Application Determined: Permission refused: 12/5/2012
Construction Date: 1/15/2018    
Generator Live 5/9/2019 This Record Last Updated: 12/11/2019
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 12/5/2012

 OFGEM Data on this Project: Common Barn: Wind :

 Calculations


Capacity: 12
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 1/3/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 12 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 353796

Project Info
COMMON BARN Wind Farm

COMMON BARN Wind Farm

©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School