Sorry I found no matches, Please try again. 176
vid = 69pws_id = 371374pws_id = 371374
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.118.93.61 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Braich Ddu Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Braich Ddu Wind Farm (Wind , Active)

 General Information.

Location in the UK : Wales, Gwynedd    
Type of installation: Wind    on/offshore: on
Turbines :3  Capacity : 3.9 MW
Approx Date of 1st power generation: January 2008

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Three wind turbines have been generating renewable electricity at Braich Ddu Wind Farm since 2008. Gwynedd Council granted permission for the wind farm, which is located on farmland near the village of Glanrafon.

 Turbine Make and Specs

Model: Nordex N60/1300 Start Speed: 4.5
Capacity: 1.3 Optimal Speed: 10
Rotor Diameter: 60 Stop Speed: 25
Hub Height 60   Avg for all turbines:60 Avg. Elevation: 347
Web Page: http://www.nordex-online.com/fileadmin/MEDIA/Produktinfos/EN/Nordex_N60_EN.pdf
Comment:

 Address

Braich Ddu Glanrafon Corwen Denbighshire Wales LL21 0HF Wales

 Associated Companies.

Relationship Company (For: Braich Ddu )
DeveloperREG Windpower

 DECC Data on this Project: Braich Ddu :-na-

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Braich Ddu     3.9 MW
Energy Type: Wind Onshore
County: Gwynedd     Country: Wales     LPA: Gwynedd Council
Site ID and Reference: 4022 / N00230W     District:
Applicant: REG Windpower (previously Cornwall Light and Power)     Application : C04M/0038/04/MW (Go to search to find Application)
For Wind Farms  
Number of Turbines: 3 Turbine Capacity: 1.3
Height of Turbines: Calculated capacity: 3.9
Site Address: Braich Ddu, Glanrafon Y Bala, Gwynedd
 
County: Gwynedd Region: Wales
OS Coordinates: 267500 / 267500
Development Status: Operational
Application Submitted: 3/11/2004 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 8/31/2007 This Record Last Updated: 10/8/2013
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Braich Ddu: Wind : -na-

 Calculations


Capacity: 7.8
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/26/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 7.8 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 371374

Project Info
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School