Sorry I found no matches, Please try again. 176
vid = 74pws_id = 353195pws_id = 353195
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.12.73.149 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Bryn Titli Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Bryn Titli Wind Farm (Wind , Active)

 General Information.

Location in the UK : Wales, Powys    
Type of installation: Wind    on/offshore: on
Turbines :22  Capacity : 9.9 MW
Approx Date of 1st power generation: July 1994

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Bryn Titli Wind Farm is owned and operated by npower renewables and was completed in 1994. It is located between Rhayader and Llangurig above the A470 on improved and semi-natural grazing pasture.

The wind farm covers an area of over 1,000 hectares (ha) but only 2.5ha are used by the turbines and access tracks.

 Turbine Make and Specs

Model: Bonus B37/450 Start Speed: 4
Capacity: 0.45 Optimal Speed: 10
Rotor Diameter: 37 Stop Speed: 23
Hub Height 30   Avg for all turbines:30 Avg. Elevation: 461
Web Page: http://www.thewindpower.net/turbine_en_353_bonus_b37-450.php
Comment: Start / Optimum and stop powers are estimated

 Address

Bryn Titli Wind Farm Pen TRhiw Farm Rhayader Powys Wales

 Associated Companies.

Relationship Company (For: Bryn Titli )
OwnerRWE Innogy
OperatorRWE Innogy

 DECC Data on this Project: Bryn Titli :3015

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Bryn titli Windfarm     9.9 MW
Energy Type: Wind Onshore
County: Powys     Country: Wales     LPA: Powys County Council
Site ID and Reference: 3015 / EN00394     District:
Applicant: Innogy     Application : R42978D (Go to search to find Application)
For Wind Farms  
Number of Turbines: 22 Turbine Capacity: 0.45000000000000001
Height of Turbines: Calculated capacity: 9.9
Site Address: Bryntitli Platuae, North of Rhayader Powys
 
County: Powys Region: Wales
OS Coordinates: 293500 / 293500
Development Status: Operational
Application Submitted: 3/12/1993 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 6/1/1994 This Record Last Updated: 10/3/2018
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Bryn Titli: Wind : R00023RQWA

Site Name: Bryn Titli Wind Farm
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00023RQWA
Capacity: 9900 Status: Live
Accreditation Date: 3/12/1993    
Commission Date: 6/1/1994    
Applicant: Beaufort Wind Ltd
Applicant Address: Riverside House Meadowbank Furlong Road Bourne End, Buckinghamshire SL8 5AJ
Address: Bryn Titli Wind Farm Pen TRhiw FarmRhayaderPowys Wales

 Calculations


Capacity: 19.8
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 23 m/s (51.451 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/21/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 19.8 start: 5 Optimum: 15/ Stop: 23 / wind: / ratio 353195

Project Info
©2018 Simon Mallett
Latest News Added
Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Nine offshore wind farm projects awarded in UK auction
The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School