Loading
Page views this IP this session = 1 of 10 unsubscribed pagesBryn Titli Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Bryn Titli Wind Farm (Wind , Active) Location in the UK : Wales, Powys Type of installation: Wind on/offshore: on Turbines :22 Capacity : 9.9 MW Approx Date of 1st power generation: July 1994
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Bryn Titli Wind Farm is owned and operated by npower renewables and was completed in 1994. It is located between Rhayader and Llangurig above the A470 on improved and semi-natural grazing pasture.
The wind farm covers an area of over 1,000 hectares (ha) but only 2.5ha are used by the turbines and access tracks.
Model: |
Bonus B37/450
|
Start Speed: |
4
|
Capacity: |
0.45
|
Optimal Speed: |
10
|
Rotor Diameter: |
37
|
Stop Speed: |
23
|
Hub Height |
30 Avg for all turbines:30
|
Avg. Elevation: |
461
|
Web Page: |
http://www.thewindpower.net/turbine_en_353_bonus_b37-450.php |
Comment: |
Start / Optimum and stop powers are estimated
|
Bryn Titli Wind Farm Pen TRhiw Farm Rhayader Powys Wales
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Bryn titli Windfarm 9.9 MW
|
Energy Type: |
Wind Onshore |
County: |
Powys Country: Wales LPA: Powys County Council
|
Site ID and Reference: |
3015 / EN00394
District:
|
Applicant: |
Innogy
Application :
R42978D
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
22 |
Turbine Capacity: |
0.45000000000000001 |
Height of Turbines: |
|
Calculated capacity: |
9.9 |
Site Address: |
Bryntitli Platuae, North of Rhayader
Powys
|
|
|
County: |
Powys Region: Wales
|
OS Coordinates: |
293500 / 293500
|
Development Status: |
Operational
|
Application Submitted: |
3/12/1993
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
6/1/1994
|
This Record Last Updated: |
10/3/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Bryn Titli Wind Farm
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00023RQWA
|
Capacity: |
9900
|
Status: |
Live
|
Accreditation Date: |
3/12/1993
|
|
|
Commission Date: |
6/1/1994
|
|
|
Applicant: |
Beaufort Wind Ltd
|
Applicant Address: |
Riverside House
Meadowbank
Furlong Road Bourne End, Buckinghamshire
SL8 5AJ
|
Address: |
Bryn Titli Wind Farm
Pen TRhiw FarmRhayaderPowys
Wales
|
Capacity: 19.8 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 23 m/s (51.451 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 11/21/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Nine offshore wind farm projects awarded in UK auction The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|