Page views this IP this session = 1 of 10 unsubscribed pagesCarno Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Carno Wind Farm (Wind , Active) Location in the UK : Wales, Powys Type of installation: Wind on/offshore: on Turbines :56 Capacity : 33.6 MW Approx Date of 1st power generation: March 2009
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Carno Extension (2). In 2008 an extension is to be added and designated "Carno 2" bringing the total number of turbines to 68. These will comprise 12 new Siemens 1.3MW wind turbines with a hub height of 49 m, blade length of 30 m, rotor diameter of 62 m giving a tip height of 80 m.
Carno 2 LLP was FIM’s first build in Wales. It is a joint venture with three local farmers who took the project through the planning process and then got FIM involved to assist with finance, build and operation of the project. Running since 2009 the site cost £20M to build and produces enough energy to power some 8,600 households.
Model: |
Bonus B44/600
|
Start Speed: |
4
|
Capacity: |
0.6
|
Optimal Speed: |
10
|
Rotor Diameter: |
44
|
Stop Speed: |
23
|
Hub Height |
31 Avg for all turbines:34
|
Avg. Elevation: |
459
|
Web Page: |
|
Comment: |
|
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Carno 3 45 MW
|
Energy Type: |
Wind Onshore |
County: |
Powys Country: Wales LPA: Powys County Council
|
Site ID and Reference: |
4571 / AA763
District:
|
Applicant: |
Amegni Renewables
Application :
P/2010/0762
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
18 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
45 |
Site Address: |
Carno, Powys, SY17 5JS
|
|
|
County: |
Powys Region: Wales
|
OS Coordinates: |
294433 / 294433
|
Development Status: |
Planning Permission Expired
|
Application Submitted: |
7/15/2010
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
5/21/2019
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
5/26/2022 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Carno ''A''and ''B'' Wind Farm, (Extension) 15.6 MW
|
Energy Type: |
Wind Onshore |
County: |
Powys Country: Wales LPA: Powys County Council
|
Site ID and Reference: |
3277 / N00444W
District:
|
Applicant: |
RWE npower
Application :
M2003/1156
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
12 |
Turbine Capacity: |
1.3 |
Height of Turbines: |
|
Calculated capacity: |
15.6 |
Site Address: |
Cwm Cledan
, Carno
, Powys
|
|
|
County: |
Powys Region: Wales
|
OS Coordinates: |
293000 / 293000
|
Development Status: |
Operational
|
Application Submitted: |
10/10/2003
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
3/1/2009
|
This Record Last Updated: |
1/6/2010
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Carno ''B'' Wind Farm 16.8 MW
|
Energy Type: |
Wind Onshore |
County: |
Powys Country: Wales LPA: Powys County Council
|
Site ID and Reference: |
2564 / 04050W3
District:
|
Applicant: |
RWE npower
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
28 |
Turbine Capacity: |
0.59999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
16.8 |
Site Address: |
Trannon Moor, Carno, Powys
|
|
|
County: |
Powys Region: Wales
|
OS Coordinates: |
291053 / 291053
|
Development Status: |
Operational
|
Application Submitted: |
12/30/1993
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
10/1/1996
|
This Record Last Updated: |
10/30/2011
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Carno ''A'' Wind Farm 16.8 MW
|
Energy Type: |
Wind Onshore |
County: |
Powys Country: Wales LPA: Powys County Council
|
Site ID and Reference: |
2565 / 04051W3
District:
|
Applicant: |
RWE npower
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
28 |
Turbine Capacity: |
0.59999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
16.8 |
Site Address: |
Cwm Cledan
Carno
Powys
|
|
|
County: |
Powys Region: Wales
|
OS Coordinates: |
293000 / 293000
|
Development Status: |
Operational
|
Application Submitted: |
8/16/1993
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
10/1/1996
|
This Record Last Updated: |
10/30/2011
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Capacity: 48.6000000000001 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 23 m/s (51.451 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 1/30/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|