Causeymire Wind Farm (Wind , Active) Location in the UK : Scotland, Achkeepster, Caithness Type of installation: Wind on/offshore: on Turbines :21 Capacity : 48 MW Approx Date of 1st power generation: November 2004
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Causeymire Wind Farm, located at Achkeepster, on the A9 road, 30km south west of John O'Groats, became fully operational in 2004. Causeymire consists of 21 turbines, and is capable of generating more than 48 megawatts (MW) of renewable electricity.
Even taking into consideration times of low wind speeds, Causeymire is powerful enough to supply clean electricity to approximately 25,000 homes each year, put another way, enough to meet the annual domestic electricity needs of Caithness twice over*1.
An application has been made to allow an additional 3 turbines, already consented by the Highland Council, to be constructed and generate on the existing site. This would increase the capacity to more than 55 megawatts, raising the number of homes Causeymire can supply each year to some 28,500.
Model: |
Bonus B82/2.3
|
Start Speed: |
3.5
|
Capacity: |
2.3
|
Optimal Speed: |
15
|
Rotor Diameter: |
0
|
Stop Speed: |
25
|
Hub Height |
60 Avg for all turbines:60
|
Avg. Elevation: |
84
|
Web Page: |
|
Comment: |
|
Causeymire Wind Farm Achkeepster Watten Wick Caithness KW1 5XR
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Causeymire 48.3 MW
|
Energy Type: |
Wind Onshore |
County: |
Highland Country: Scotland LPA: Highland Council
|
Site ID and Reference: |
3108 / N00044W
District:
|
Applicant: |
Innogy (formerly RWE npower)
Application :
01/00361/FULCA
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
24 |
Turbine Capacity: |
2 |
Height of Turbines: |
|
Calculated capacity: |
48 |
Site Address: |
Causey Mire, Caithness, Highlands
|
|
|
County: |
Highland Region: Scotland
|
OS Coordinates: |
336736 / 336736
|
Development Status: |
Operational
|
Application Submitted: |
11/1/2001
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
6/1/2004
|
This Record Last Updated: |
5/18/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Capacity: 195.6 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 11/21/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
Caithness farmers claim noise from surrounding wind farms is making them ill Hamish and Lesley Ritchie keep around 170 sheep on rough grazing at Achaguie Farm, Scotscalder.
They are within earshot of 42 wind turbines – 21 at CAUSEYMIRE and 21 at Baillie, near Reay.
Youtube: CAUSEYMIRE Wind Farm
CAUSEYMIRE Wind Farm
(2012) Caithness Spittal Hill wind farm plans rejected The area already has CAUSEYMIRE, Flex Hill and Achairn wind farms, while one at Camster has planning consent and another farm has been proposed for Halsary.
Wind farm 'would affect Wick airport' The other farms are at Forss, CAUSEYMIRE, Boulfruich, Flexhill, Achairn, Baillie, Camster, Bettyhill, Strathy North, Strathy South, South Shebster, Hill of Lieurary, Burn of Whilk, Stroupster, Bower, Durran, Olgrinmore, Halsary and Wathegar.
|
|
©2018
Simon Mallett |
Latest News Added |
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Nine offshore wind farm projects awarded in UK auction The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|