Sorry I found no matches, Please try again. 176
vid = 116pws_id = 352106pws_id = 352106
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.218.108.24 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Craigengelt Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Craigengelt Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Stirling, Craigengelt    
Type of installation: Wind    on/offshore: on
Turbines :8  Capacity : 21 MW
Approx Date of 1st power generation: March 2010

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Craigengelt Wind Farm lies around the summit of Craigengelt Hill in Stirling

 Turbine Make and Specs

Model: Nordex N90 Start Speed: 4
Capacity: 2.3 Optimal Speed: 12
Rotor Diameter: 90 Stop Speed: 25
Hub Height 80   Avg for all turbines:78 Avg. Elevation: 331
Web Page: http://www.nordex-online.com/en/produkte-service/wind-turbines/n90-25-mw.html
Comment: N90 suits inland locations

 Address

Craigengelt Hill Stirling FK79QS Scotland

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Craigengelt )

 DECC Data on this Project: Craigengelt :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Craigengelt     20 MW
Energy Type: Wind Onshore
County: Stirling     Country: Scotland     LPA: Stirling Council
Site ID and Reference: 2940 / EN00158     District:
Applicant: Scotia Wind Ltd     Application : 06/01052/DET (Go to search to find Application)
For Wind Farms  
Number of Turbines: 8 Turbine Capacity: 2.5
Height of Turbines: Calculated capacity: 20
Site Address: Craigengelt Hill, Stirling
 
County: Stirling Region: Scotland
OS Coordinates: 272451 / 272451
Development Status: Operational
Application Submitted: 12/1/2006 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 5/1/2009    
Generator Live 3/31/2010 This Record Last Updated: 6/9/2010
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Craigengelt: Wind :

Site Name: Scotia Wind (Craigengelt) Limited
Generator Type: Wind
Scheme : REGO Generator ID: G01601NWSC
Capacity: 19667 Status: Live
Accreditation Date: 12/1/2006    
Commission Date: 10/29/2009    
Applicant: Scotia Wind (Craigengelt) Limited
Applicant Address: 1 City Walk Leeds LS11 9DX England
Address: Craigengelt Hill Stirling FK79QS Scotland
 
Assumptions: Capacity: 19667kW 19.667 MW,
Thus over the month Capacity * 720 hours per month = 14160.24 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 5352 27.21% Issued
01/03/2018 5833 29.66% Issued
01/02/2018 4914 24.99% Issued
01/01/2018 6170 31.37% Issued
01/12/2017 6011 30.56% Issued
01/11/2017 5251 26.70% Issued
01/11/2017 9 0.05% Issued
01/10/2017 7396 37.61% Issued
01/09/2017 11 0.06% Revoked
01/09/2017 3143 15.98% Issued
01/08/2017 4190 21.30% Issued
01/07/2017 4460 22.68% Issued
01/06/2017 5223 26.56% Issued
01/05/2017 3555 18.08% Issued
01/04/2017 5641 28.68% Issued
01/03/2017 5254 26.71% Redeemed
01/02/2017 6395 32.52% Redeemed
01/01/2017 4878 24.80% Redeemed
Dec-16 06912 6912 35.15% Issued
Nov-16 04450 4450 22.63% Issued
Oct-16 03427 3427 17.43% Issued
Sep-16 05047 5047 25.66% Issued
Aug-16 04315 4315 21.94% Issued
Jul-16 04145 4145 21.08% Issued
Jul-16 04145 4145 21.08% Issued
Jun-16 02291 2305 11.72% Issued
May-16 03964 3964 20.16% Issued
Mar-16 03703 3703 18.83% Redeemed
Feb-16 04339 4339 22.06% Redeemed
Jan-16 06678 6678 33.96% Redeemed
Dec-15 09167 9167 46.61% Redeemed
Nov-15 07114 7114 36.17% Redeemed
Oct-15 03283 3283 16.69% Redeemed
Sep-15 01827 1839 9.35% Redeemed
Aug-15 04368 4368 22.21% Redeemed
Jul-15 35563556 3556 18.08% Redeemed
Jun-15 38933892 3892 19.79% Redeemed
May-15 71067106 7106 36.13% Redeemed
Apr-15 40144014 4014 20.41% Redeemed
Mar-15 68526851 6851 34.84% Redeemed
Feb-15 58215821 5821 29.60% Redeemed
Jan-15 81338133 8133 41.35% Redeemed
Dec-14 70797079 7079 35.99% Redeemed
Nov-14 36853684 3684 18.73% Redeemed
Oct-14 68646864 6864 34.90% Redeemed
Sep-14 19961980 1997 10.15% Redeemed
Aug-14 40834083 4083 20.76% Redeemed
Jul-14 29182918 2918 14.84% Redeemed
Jun-14 14301415 1430 7.27% Redeemed
May-14 32353235 3235 16.45% Redeemed
Apr-14 53235323 5323 27.07% Redeemed
Mar-14 70497049 7049 35.84% Redeemed
Feb-14 75927592 7592 38.60% Redeemed
Jan-14 59445943 5943 30.22% Redeemed
Dec-13 97199720 9720 49.42% Redeemed
Nov-13 57015701 5701 28.99% Redeemed
Oct-13 63316331 6331 32.19% Redeemed
Sep-13 40654065 3793 19.29% Redeemed
Aug-13 39503950 3950 20.08% Redeemed
Jul-13 25592559 2559 13.01% Redeemed
Jun-13 27052705 2705 13.75% Redeemed
May-13 56075607 5607 28.51% Redeemed
Apr-13 61936193 6193 31.49% Redeemed
Mar-13 64386438 6438 32.74% Redeemed
Feb-13 37813781 3781 19.23% Redeemed
Jan-13 57755775 5775 29.36% Redeemed
Dec-12 60266026 6026 30.64% Redeemed
Nov-12 53645364 5364 27.27% Redeemed
Oct-12 30853085 3085 15.69% Redeemed
Sep-12 66636663 6663 33.88% Redeemed
Aug-12 24432443 2443 12.42% Redeemed
Jul-12 27332733 2733 13.90% Redeemed
Jun-12 36683668 3668 18.65% Redeemed
May-12 34373437 3437 17.48% Redeemed
Apr-12 35703570 3570 18.15% Redeemed
Mar-12 49734973 4973 25.29% Redeemed
Feb-12 59395939 5139 26.13% Redeemed
Jan-12 74957496 7496 38.11% Redeemed
Dec-11 75407539 7539 38.33% Redeemed
Nov-11 61756175 6175 31.40% Redeemed
Oct-11 72917291 7291 37.07% Redeemed
Sep-11 54405441 5441 27.67% Redeemed
Aug-11 28352835 2835 14.42% Redeemed
Jul-11 12371237 1237 6.29% Redeemed
Jun-11 29952995 2995 15.23% Redeemed
May-11 70307030 7030 35.75% Redeemed
Apr-11 48344835 4835 24.58% Redeemed
Mar-11 36663666 3666 18.64% Redeemed
Feb-11 40814081 4081 20.75% Redeemed
Jan-11 51195119 5119 26.03% Redeemed
Dec-10 30403039 3039 15.45% Redeemed

 Calculations


Capacity: 40
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/23/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 40 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 352106

Project Info
RJ McLeod: CRAIGENGELT Wind Farm, Stirlingshire

Scotish Places: CRAIGENGELT Wind Farm

Natural Power, has completed contractual agreements
CRAIGENGELT hill wind farm near Falkirk, Scotland, will be managed on behalf of GDF SUEZ Energy UK. The 20MW site comprising of 8 Nordex turbines is now operational, with Natural Power providing a full range of management services

Ballindalloch Muir windfarm should not go ahead say consultants
“no areas in which potential capacity was identified for wind turbines over 110 metres high” including the proposed windfarm at Ballindalloch Muir and CRAIGENGELT hill , Muirpark, Kingsburn and the Earlsburn extension.

Carron Wind Farm Plans Submitted
West Dunbartonshire firm Lomond Energy has submitted its plans for a new wind farm near Carron Bridge, adjacent to the operating turbines at CRAIGENGELT hill.

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School