Burnt Stump Energy from Waste Plant

Burnt Stump (Waste , Active, Waste - Landfill Gas)

 General Information.

Location in the UK : England, NG5 8PR    
Type of installation: Waste    on/offshore: on
Turbines :0  Capacity : 0.963 MW
Approx Date of 1st power generation: January 1999

/YES

 Comment


 Address

Ollerton Road, Nottingham, NG5 8PR

 Associated Companies.

Relationship Company (For: Burnt Stump )
Ownerinfinis
Operatorinfinis
DeveloperWaste Recycling Group

 DECC Data on this Project: Burnt Stump :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Burntstump Landfill Scheme     1.8 MW
Energy Type: Landfill Gas
County: Nottinghamshire     Country: England     LPA: Gedling Borough Council
Site ID and Reference: 532 / 02020L4     District:
Applicant: Waste Recycling Group     Application : (Go to search to find Application)
Site Address: Ollerton Road Nottinghamshire
 
County: Nottinghamshire Region: East Midlands
OS Coordinates: 458500 / 458500
Development Status: Operational
Application Submitted: Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 4/15/1999 This Record Last Updated: 12/19/2014
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Burnt Stump: Waste :

Site Name: Burnt Stump (Non-NFFO)
Generator Type: Landfill gas (RO code = RJ)
Scheme : RO Generator ID: R00002RJEN
Capacity: 1003 Status: Live
Accreditation Date:    
Commission Date: 5/1/1999    
Applicant: Infinis Limited
Applicant Address: First Floor 500 Pavilion Drive Northampton Business Park Northampton NN4 7YJ
Address: Burnt Stump NFFO 5 Ollerton RoadNottinghamNottinghamshire England

Site Name: Burnt Stump (Non-NFFO)
Generator Type: Landfill Gas (REGO code = LG)
Scheme : REGO Generator ID: G00069LGEN
Capacity: 1003 Status: Live
Accreditation Date:    
Commission Date: 5/1/1999    
Applicant: Infinis Limited
Applicant Address: First Floor 500 Pavilion Drive Northampton Business Park Northampton NN4 7YJ
Address: Burnt Stump NFFO 5 Ollerton RoadNottinghamNottinghamshire England
 
Sorry I found no matches, Please try again.
Assumptions: Capacity: 1003kW 1.003 MW,
Thus over the month Capacity * 720 hours per month = 722.16 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status

Project Info
Sorry I found no matches, Please try again.
©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School