Sorry I found no matches, Please try again. 176
vid = 1304pws_id = 324250pws_id = 324250
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.145.9.174 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

SWAFFHAM PLASHES Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

SWAFFHAM PLASHES Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Eastern England    
Type of installation: Wind    on/offshore: on
Turbines :0  Capacity : 0.632 MW
Approx Date of 1st power generation: July 2003

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment


 Turbine Make and Specs

Model: Wind Turbine- Generic Start Speed: 5
Capacity: 2 Optimal Speed: 15
Rotor Diameter: 100 Stop Speed: 25
Hub Height 0   Avg for all turbines: Avg. Elevation:
Web Page:
Comment:

 Address

adj.to West Acre Road,Swaffham,Norfolk

 Associated Companies.

Relationship Company (For: SWAFFHAM PLASHES )
DeveloperECOTRICITY Group Limited

 DECC Data on this Project: SWAFFHAM PLASHES :-na-

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Swaffham Plashes II     1.8 MW
Energy Type: Wind Onshore
County: Norfolk     Country: England     LPA: Breckland Council
Site ID and Reference: 3159 / N00126W     District:
Applicant: Ecotricity     Application : 3PL/2001/1505/F (Go to search to find Application)
For Wind Farms  
Number of Turbines: 1 Turbine Capacity: 1.79
Height of Turbines: Calculated capacity: 1.79
Site Address: Old Sporle Road Swaffham
 
County: Norfolk Region: Eastern
OS Coordinates: 582760 / 582760
Development Status: Operational
Application Submitted: 12/11/2001 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 7/15/2003 This Record Last Updated: 9/22/2004
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: SWAFFHAM PLASHES: Wind : -na-

 Calculations


Capacity: 1
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 1/15/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 1 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 324250

Project Info
Sorry I found no matches, Please try again.
©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School