Gunfleet Sands Wind Farm (Wind , Active) Location in the UK : England, Hull Type of installation: Wind on/offshore: off Turbines :48 Capacity : 210 MW Approx Date of 1st power generation: Spring 2010
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Gunfleet Sands Offshore Wind Farm consists of two phases, Gunfleet Sands 1 with 30 turbines and Gunfleet Sands 2 with 18 turbines. Total capacity of Gunfleet Sands Offshore Wind Farm is 172MW corresponding to the consumption of 125,000 British households.
Model: |
Siemens SWT 3.6 107
|
Start Speed: |
4
|
Capacity: |
3.6
|
Optimal Speed: |
13
|
Rotor Diameter: |
107
|
Stop Speed: |
25
|
Hub Height |
75 Avg for all turbines:75
|
Avg. Elevation: |
|
Web Page: |
http://www.energy.siemens.com/hq/en/renewable-energy/wind-power/platforms/g4-platform/wind-turbine-swt-3-6-107.htm#content=Technical%20Specification |
Comment: |
The rotor of the SWT-3.6-107 turbine is a three-blade cantilevered construction, mounted upwind of the tower.
|
Gunfleet Sands Offshore Windfarm Near Clacton NA England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Gunfleet Sands II 64.8 MW
|
Energy Type: |
Wind Offshore |
County: |
Offshore Country: England LPA: DECC (S36)
|
Site ID and Reference: |
2489 / N00457W
District:
|
Applicant: |
Orsted (formerly Dong Energy)
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
18 |
Turbine Capacity: |
3.6000000000000001 |
Height of Turbines: |
|
Calculated capacity: |
64.8 |
Site Address: |
5 Miles from the Essex coast at Frinton-on-Sea
|
|
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
624262 / 624262
|
Development Status: |
Operational
|
Application Submitted: |
6/18/2007
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
4/1/2009
|
|
|
Generator Live |
7/24/2009
|
This Record Last Updated: |
11/20/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Gunfleet Sands Offshore Wind Scheme 108 MW
|
Energy Type: |
Wind Offshore |
County: |
Offshore Country: England LPA: DECC (S36)
|
Site ID and Reference: |
2490 / 01041W4
District:
|
Applicant: |
Orsted (formerly Dong Energy)
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
30 |
Turbine Capacity: |
3.6000000000000001 |
Height of Turbines: |
|
Calculated capacity: |
108 |
Site Address: |
Gunfleet Sands 4 miles offshore from Holland-on-Sea Nr Clacton-on-Sea Essex
|
|
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
622317 / 622317
|
Development Status: |
Operational
|
Application Submitted: |
3/1/2002
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
4/1/2009
|
|
|
Generator Live |
7/24/2009
|
This Record Last Updated: |
5/1/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Gunfleet Sands - (Demo) Extension 12 MW
|
Energy Type: |
Wind Offshore |
County: |
Offshore Country: England LPA: DECC (S36)
|
Site ID and Reference: |
2488 / A0438
District:
|
Applicant: |
Orsted (formerly Dong Energy)
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
2 |
Turbine Capacity: |
6 |
Height of Turbines: |
|
Calculated capacity: |
12 |
Site Address: |
off the Essex coast
|
|
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
620650 / 620650
|
Development Status: |
Operational
|
Application Submitted: |
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
5/15/2012
|
|
|
Generator Live |
4/19/2013
|
This Record Last Updated: |
11/20/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Gunfleet Sands Demo
|
Generator Type: |
Off-shore wind (RO code = RP)
|
Scheme : |
RO
|
Generator ID: |
R00026RPEN
|
Capacity: |
11700
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
8/26/2013
|
|
|
Applicant: |
DONG Energy Gunfleet Sands Demo (UK) Ltd
|
Applicant Address: |
Nesa Allé 1
Gentofte
2820
Overseas - Denmark
|
Address: |
Offshore: 8,5 km off the coast of Clacton-on-Sea
Onshore: Park Road, Clacton-on-sea, Essex, CO15 1H
Clacton-on-Sea
England
|
Site Name: |
Gunfleet Sands Demo
|
Generator Type: |
Off-shore wind (REGO code = FW)
|
Scheme : |
REGO
|
Generator ID: |
G01168FWEN
|
Capacity: |
11700
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
8/26/2013
|
|
|
Applicant: |
DONG Energy Gunfleet Sands Demo (UK) Ltd
|
Applicant Address: |
Nesa Allé 1
Gentofte
2820
Overseas - Denmark
|
Address: |
Offshore: 8,5 km off the coast of Clacton-on-Sea
Onshore: Park Road, Clacton-on-sea, Essex, CO15 1H
Clacton-on-Sea
England
|
|
Assumptions: Capacity: 11700kW 11.7 MW, Thus over the month Capacity * 720 hours per month = 8424 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/04/2018 | | | 2547 | 21.77% | Issued | 01/03/2018 | | | 3504 | 29.95% | Issued | 01/02/2018 | | | 3685 | 31.50% | Issued | 01/01/2018 | | | 4492 | 38.39% | Issued | 01/12/2017 | | | 4413 | 37.72% | Issued | 01/11/2017 | | | 3375 | 28.85% | Issued | 01/10/2017 | | | 4258 | 36.39% | Issued | 01/09/2017 | | | 2387 | 20.40% | Issued | 01/08/2017 | | | 1888 | 16.14% | Issued | 01/07/2017 | | | 2261 | 19.32% | Issued | 01/06/2017 | | | 2320 | 19.83% | Issued | 01/05/2017 | | | 2149 | 18.37% | Issued | 01/04/2017 | | | 1761 | 15.05% | Issued | 01/03/2017 | | | 3346 | 28.60% | Retired | 01/03/2017 | | | 456 | 3.90% | Redeemed | 01/02/2017 | | | 413 | 3.53% | Redeemed | 01/02/2017 | | | 3030 | 25.90% | Retired | 01/01/2017 | | | 2188 | 18.70% | Retired | 01/01/2017 | | | 298 | 2.55% | Redeemed | Dec-16 | 0 | 5698 | 2849 | 24.35% | Issued | Nov-16 | 0 | 5205 | 312 | 2.67% | Issued | Oct-16 | 0 | 4655 | 2327 | 19.89% | Issued | Sep-16 | 0 | 4646 | 2323 | 19.85% | Issued | Aug-16 | 0 | 5438 | 2719 | 23.24% | Issued | Jul-16 | 0 | 4387 | 2194 | 18.75% | Issued | Jul-16 | 0 | 4387 | 2194 | 18.75% | Issued | May-16 | 0 | 4417 | 2209 | 18.88% | Issued | Jan-16 | 0 | 10766 | 5222 | 44.63% | Issued | Dec-15 | 0 | 13018 | 6509 | 55.63% | Retired | Nov-15 | 0 | 9915 | 4958 | 42.38% | Retired | Oct-15 | 0 | 4040 | 2020 | 17.26% | Retired | Sep-15 | 0 | 4026 | 2013 | 17.21% | Retired | Aug-15 | 0 | 4415 | 2208 | 18.87% | Retired | Jul-15 | 2955 | 5910 | 89 | 0.76% | Redeemed | Jun-15 | 2373 | 4746 | 427 | 3.65% | Redeemed | May-15 | 3226 | 6451 | 935 | 7.99% | Redeemed | Apr-15 | 1874 | 3749 | 56 | 0.48% | Redeemed | Mar-15 | 3337 | 6675 | 2003 | 17.12% | Retired | Feb-15 | 2965 | 5928 | 1777 | 15.19% | Retired | Jan-15 | 3739 | 7480 | 2244 | 19.18% | Retired | Dec-14 | 2614 | 5227 | 1567 | 13.39% | Retired | Nov-14 | 1227 | 2442 | 737 | 6.30% | Retired | Oct-14 | 3285 | 6570 | 1314 | 11.23% | Redeemed | Sep-14 | 785 | 1551 | 471 | 4.03% | Retired | Aug-14 | 1873 | 3746 | 749 | 6.40% | Redeemed | Jul-14 | 1587 | 3174 | 952 | 8.14% | Retired | Jun-14 | 1053 | 2092 | 632 | 5.40% | Retired | May-14 | 1930 | 3859 | 1159 | 9.91% | Retired | Apr-14 | 1939 | 3879 | 775 | 6.62% | Redeemed | Mar-14 | 2696 | 5392 | 2696 | 23.04% | Retired | Feb-14 | 4894 | 9787 | 4893 | 41.82% | Retired | Jan-14 | 4960 | 9919 | 4960 | 42.39% | Retired | Dec-13 | 3458 | 6917 | 3458 | 29.56% | Retired | Nov-13 | 2912 | 5824 | 2911 | 24.88% | Retired | Oct-13 | 3801 | 7264 | 3800 | 32.48% | Retired | Sep-13 | 2021 | 1952 | 2021 | 17.27% | Retired | Aug-13 | 992 | 0 | 993 | 8.49% | Expired |
|
Capacity: 384 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|