Gunfleet Sands Wind Farm (Wind , Active) Location in the UK : England, Hull Type of installation: Wind on/offshore: off Turbines :48 Capacity : 210 MW Approx Date of 1st power generation: Spring 2010
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Gunfleet Sands Offshore Wind Farm consists of two phases, Gunfleet Sands 1 with 30 turbines and Gunfleet Sands 2 with 18 turbines. Total capacity of Gunfleet Sands Offshore Wind Farm is 172MW corresponding to the consumption of 125,000 British households.
Model: |
Siemens SWT 3.6 107
|
Start Speed: |
4
|
Capacity: |
3.6
|
Optimal Speed: |
13
|
Rotor Diameter: |
107
|
Stop Speed: |
25
|
Hub Height |
75 Avg for all turbines:75
|
Avg. Elevation: |
|
Web Page: |
http://www.energy.siemens.com/hq/en/renewable-energy/wind-power/platforms/g4-platform/wind-turbine-swt-3-6-107.htm#content=Technical%20Specification |
Comment: |
The rotor of the SWT-3.6-107 turbine is a three-blade cantilevered construction, mounted upwind of the tower.
|
Gunfleet Sands Offshore Windfarm Near Clacton NA England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Gunfleet Sands II 64.8 MW
|
Energy Type: |
Wind Offshore |
County: |
Offshore Country: England LPA: DECC (S36)
|
Site ID and Reference: |
2489 / N00457W
District:
|
Applicant: |
Orsted (formerly Dong Energy)
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
18 |
Turbine Capacity: |
3.6000000000000001 |
Height of Turbines: |
|
Calculated capacity: |
64.8 |
Site Address: |
5 Miles from the Essex coast at Frinton-on-Sea
|
|
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
624262 / 624262
|
Development Status: |
Operational
|
Application Submitted: |
6/18/2007
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
4/1/2009
|
|
|
Generator Live |
7/24/2009
|
This Record Last Updated: |
11/20/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Gunfleet Sands Offshore Wind Scheme 108 MW
|
Energy Type: |
Wind Offshore |
County: |
Offshore Country: England LPA: DECC (S36)
|
Site ID and Reference: |
2490 / 01041W4
District:
|
Applicant: |
Orsted (formerly Dong Energy)
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
30 |
Turbine Capacity: |
3.6000000000000001 |
Height of Turbines: |
|
Calculated capacity: |
108 |
Site Address: |
Gunfleet Sands 4 miles offshore from Holland-on-Sea Nr Clacton-on-Sea Essex
|
|
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
622317 / 622317
|
Development Status: |
Operational
|
Application Submitted: |
3/1/2002
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
4/1/2009
|
|
|
Generator Live |
7/24/2009
|
This Record Last Updated: |
5/1/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Gunfleet Sands - (Demo) Extension 12 MW
|
Energy Type: |
Wind Offshore |
County: |
Offshore Country: England LPA: DECC (S36)
|
Site ID and Reference: |
2488 / A0438
District:
|
Applicant: |
Orsted (formerly Dong Energy)
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
2 |
Turbine Capacity: |
6 |
Height of Turbines: |
|
Calculated capacity: |
12 |
Site Address: |
off the Essex coast
|
|
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
620650 / 620650
|
Development Status: |
Operational
|
Application Submitted: |
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
5/15/2012
|
|
|
Generator Live |
4/19/2013
|
This Record Last Updated: |
11/20/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Gunfleet Sands Demo
|
Generator Type: |
Off-shore wind (RO code = RP)
|
Scheme : |
RO
|
Generator ID: |
R00026RPEN
|
Capacity: |
11700
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
8/26/2013
|
|
|
Applicant: |
DONG Energy Gunfleet Sands Demo (UK) Ltd
|
Applicant Address: |
Nesa Allé 1
Gentofte
2820
Overseas - Denmark
|
Address: |
Offshore: 8,5 km off the coast of Clacton-on-Sea
Onshore: Park Road, Clacton-on-sea, Essex, CO15 1H
Clacton-on-Sea
England
|
Site Name: |
Gunfleet Sands Demo
|
Generator Type: |
Off-shore wind (REGO code = FW)
|
Scheme : |
REGO
|
Generator ID: |
G01168FWEN
|
Capacity: |
11700
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
8/26/2013
|
|
|
Applicant: |
DONG Energy Gunfleet Sands Demo (UK) Ltd
|
Applicant Address: |
Nesa Allé 1
Gentofte
2820
Overseas - Denmark
|
Address: |
Offshore: 8,5 km off the coast of Clacton-on-Sea
Onshore: Park Road, Clacton-on-sea, Essex, CO15 1H
Clacton-on-Sea
England
|
|
Assumptions: Capacity: 11700kW 11.7 MW, Thus over the month Capacity * 720 hours per month = 8424 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/04/2018 | | | 2547 | 21.77% | Issued | 01/03/2018 | | | 3504 | 29.95% | Issued | 01/02/2018 | | | 3685 | 31.50% | Issued | 01/01/2018 | | | 4492 | 38.39% | Issued | 01/12/2017 | | | 4413 | 37.72% | Issued | 01/11/2017 | | | 3375 | 28.85% | Issued | 01/10/2017 | | | 4258 | 36.39% | Issued | 01/09/2017 | | | 2387 | 20.40% | Issued | 01/08/2017 | | | 1888 | 16.14% | Issued | 01/07/2017 | | | 2261 | 19.32% | Issued | 01/06/2017 | | | 2320 | 19.83% | Issued | 01/05/2017 | | | 2149 | 18.37% | Issued | 01/04/2017 | | | 1761 | 15.05% | Issued | 01/03/2017 | | | 3346 | 28.60% | Retired | 01/03/2017 | | | 456 | 3.90% | Redeemed | 01/02/2017 | | | 413 | 3.53% | Redeemed | 01/02/2017 | | | 3030 | 25.90% | Retired | 01/01/2017 | | | 2188 | 18.70% | Retired | 01/01/2017 | | | 298 | 2.55% | Redeemed | Dec-16 | 0 | 5698 | 2849 | 24.35% | Issued | Nov-16 | 0 | 5205 | 312 | 2.67% | Issued | Oct-16 | 0 | 4655 | 2327 | 19.89% | Issued | Sep-16 | 0 | 4646 | 2323 | 19.85% | Issued | Aug-16 | 0 | 5438 | 2719 | 23.24% | Issued | Jul-16 | 0 | 4387 | 2194 | 18.75% | Issued | Jul-16 | 0 | 4387 | 2194 | 18.75% | Issued | May-16 | 0 | 4417 | 2209 | 18.88% | Issued | Jan-16 | 0 | 10766 | 5222 | 44.63% | Issued | Dec-15 | 0 | 13018 | 6509 | 55.63% | Retired | Nov-15 | 0 | 9915 | 4958 | 42.38% | Retired | Oct-15 | 0 | 4040 | 2020 | 17.26% | Retired | Sep-15 | 0 | 4026 | 2013 | 17.21% | Retired | Aug-15 | 0 | 4415 | 2208 | 18.87% | Retired | Jul-15 | 2955 | 5910 | 89 | 0.76% | Redeemed | Jun-15 | 2373 | 4746 | 427 | 3.65% | Redeemed | May-15 | 3226 | 6451 | 935 | 7.99% | Redeemed | Apr-15 | 1874 | 3749 | 56 | 0.48% | Redeemed | Mar-15 | 3337 | 6675 | 2003 | 17.12% | Retired | Feb-15 | 2965 | 5928 | 1777 | 15.19% | Retired | Jan-15 | 3739 | 7480 | 2244 | 19.18% | Retired | Dec-14 | 2614 | 5227 | 1567 | 13.39% | Retired | Nov-14 | 1227 | 2442 | 737 | 6.30% | Retired | Oct-14 | 3285 | 6570 | 1314 | 11.23% | Redeemed | Sep-14 | 785 | 1551 | 471 | 4.03% | Retired | Aug-14 | 1873 | 3746 | 749 | 6.40% | Redeemed | Jul-14 | 1587 | 3174 | 952 | 8.14% | Retired | Jun-14 | 1053 | 2092 | 632 | 5.40% | Retired | May-14 | 1930 | 3859 | 1159 | 9.91% | Retired | Apr-14 | 1939 | 3879 | 775 | 6.62% | Redeemed | Mar-14 | 2696 | 5392 | 2696 | 23.04% | Retired | Feb-14 | 4894 | 9787 | 4893 | 41.82% | Retired | Jan-14 | 4960 | 9919 | 4960 | 42.39% | Retired | Dec-13 | 3458 | 6917 | 3458 | 29.56% | Retired | Nov-13 | 2912 | 5824 | 2911 | 24.88% | Retired | Oct-13 | 3801 | 7264 | 3800 | 32.48% | Retired | Sep-13 | 2021 | 1952 | 2021 | 17.27% | Retired | Aug-13 | 992 | 0 | 993 | 8.49% | Expired |
|
Capacity: 384 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 12/3/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|