Westmill Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Westmill Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Watchfield, South Oxfordshire    
Type of installation: Wind    on/offshore: on
Turbines :5  Capacity : 6.5 MW
Approx Date of 1st power generation: february 2008

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Westmill Wind Farm Co-op is the first onshore wind farm to be built in the south-east of England and is 100% Community Owned.
Work on the five turbine site at Watchfield, South Oxfordshire, started in August 2007 and was commissioned in March 2008. The wind farm produces enough green electricity to power more than 2,500 homes whilst saving the emissions of carbon dioxide.
The Cooperative's own site (wind and solar): http://www.weset.org/contact.htm

 Turbine Make and Specs

Model: Bonus B62/1.3 Start Speed: 4
Capacity: 1.3 Optimal Speed: 10
Rotor Diameter: 62 Stop Speed: 23
Hub Height 49   Avg for all turbines:49 Avg. Elevation: 110
Web Page:
Comment:

 Address

Watchfield Airfield, Watchfield, Swindon. SN6 8TH

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Westmill )

 DECC Data on this Project: Westmill :3264

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Westmill Wind Farm     6.5 MW
Energy Type: Wind Onshore
County: Oxfordshire     Country: England     LPA: Vale of White Horse District Council
Site ID and Reference: 3264 / N00386W     District:
Applicant: Private Developer     Application : WAT/1611/9/00 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 5 Turbine Capacity: 1.3
Height of Turbines: Calculated capacity: 6.5
Site Address: Westmill Farm , Highworth Road , Watchfield , Swindon , Oxon
  SN6 8TH
County: Oxfordshire Region: South East
OS Coordinates: 423218 / 423218
Development Status: Operational
Application Submitted: 9/1/2000 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 1/1/2008 This Record Last Updated: 6/9/2010
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Westmill: Wind : R00190RQEN

Site Name: Westmill Wind Farm (19/02/2008) - A
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00190RQEN
Capacity: 6500 Status: Live
Accreditation Date: 9/1/2000    
Commission Date: 1/1/2008    
Applicant: Westmill Wind Farm Co-operative Ltd
Applicant Address: Unit 33 Trinity Enterprise Centre Furness Business Park Cumbria LA14 2PN
Address: Westmill Wind Farm (19/02/2008) - A Westmill Wind FarmWatchfieldSwindonOxfordshi SN6 8TH England

 Calculations


Capacity: 13
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 23 m/s (51.451 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/21/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 13 start: 5 Optimum: 15/ Stop: 23 / wind: / ratio 351889

Project Info
WESTMILL Wind Farm

Community Shares

WESTMILL Solar Farm

Quick fit for solar farm
The company worked against the clock to design, install and commission the electricity plant for WESTMILL Solar Farm in only six weeks. Inclused photo of site..

Updated: Just how many solar projects beat the fast-track review?
Ever since the first mention of the Fast Track Feed-in Tariff Review: how many projects will beat the August 1 cut-off? Langage WESTMILL Hawton toyota marston Rhos-Y-Gilwen wheal jane jb wheaton hendra coombe

©2018 Simon Mallett
Latest News Added
Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Nine offshore wind farm projects awarded in UK auction
The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School