Westmill Wind Farm (Wind , Active) Location in the UK : England, Watchfield, South Oxfordshire Type of installation: Wind on/offshore: on Turbines :5 Capacity : 6.5 MW Approx Date of 1st power generation: february 2008
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Westmill Wind Farm Co-op is the first onshore wind farm to be built in the south-east of England and is 100% Community Owned.
Work on the five turbine site at Watchfield, South Oxfordshire, started in August 2007 and was commissioned in March 2008. The wind farm produces enough green electricity to power more than 2,500 homes whilst saving the emissions of carbon dioxide.
The Cooperative's own site (wind and solar): http://www.weset.org/contact.htm
Model: |
Bonus B62/1.3
|
Start Speed: |
4
|
Capacity: |
1.3
|
Optimal Speed: |
10
|
Rotor Diameter: |
62
|
Stop Speed: |
23
|
Hub Height |
49 Avg for all turbines:49
|
Avg. Elevation: |
110
|
Web Page: |
|
Comment: |
|
Watchfield Airfield, Watchfield, Swindon. SN6 8TH
Relationship |
Company (For:
Westmill
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Westmill Wind Farm 6.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Oxfordshire Country: England LPA: Vale of White Horse District Council
|
Site ID and Reference: |
3264 / N00386W
District:
|
Applicant: |
Private Developer
Application :
WAT/1611/9/00
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
5 |
Turbine Capacity: |
1.3 |
Height of Turbines: |
|
Calculated capacity: |
6.5 |
Site Address: |
Westmill Farm
, Highworth Road
, Watchfield
, Swindon
, Oxon
|
|
SN6 8TH
|
County: |
Oxfordshire Region: South East
|
OS Coordinates: |
423218 / 423218
|
Development Status: |
Operational
|
Application Submitted: |
9/1/2000
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
1/1/2008
|
This Record Last Updated: |
6/9/2010
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Westmill Wind Farm (19/02/2008) - A
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00190RQEN
|
Capacity: |
6500
|
Status: |
Live
|
Accreditation Date: |
9/1/2000
|
|
|
Commission Date: |
1/1/2008
|
|
|
Applicant: |
Westmill Wind Farm Co-operative Ltd
|
Applicant Address: |
Unit 33
Trinity Enterprise Centre
Furness Business Park Cumbria
LA14 2PN
|
Address: |
Westmill Wind Farm (19/02/2008) - A
Westmill Wind FarmWatchfieldSwindonOxfordshi
SN6 8TH
England
|
Capacity: 13 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 23 m/s (51.451 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 11/21/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Nine offshore wind farm projects awarded in UK auction The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|