Page views this IP this session = 2 of 10 unsubscribed pagesTeesside Energy from Waste Plant
Teesside (Waste , Active, Waste - EFW) Location in the UK : England, TS23 1PY Type of installation: Waste on/offshore: on Turbines :0 Capacity : 20.069 MW Approx Date of 1st power generation: May 1998
/YES
ICI Process Plant Site, Billingham, Teeside, TS23 1PY
Relationship |
Company (For:
Teesside
) |
Operator | Sita | Owner | Sita |
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
North East Energy Recovery Centre (adjacent to Teesside EfW) 21 MW
|
Energy Type: |
EfW Incineration |
County: |
County Durham Country: England LPA: Stockton on Tees Borough Council
|
Site ID and Reference: |
925 / AA944
District:
|
Applicant: |
SITA UK
Application :
08/2469/EIS
|
(Go to search to find Application) |
Site Address: |
Haverton Hill Road, Billingham
|
|
TS23 1PY
|
County: |
County Durham Region: North East
|
OS Coordinates: |
448016 / 448016
|
Development Status: |
Operational
|
Application Submitted: |
7/31/2008
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
5/10/2011
|
|
|
Generator Live |
4/30/2014
|
This Record Last Updated: |
4/30/2014
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Teeside 3 EFW Plant 9.9 MW
|
Energy Type: |
EfW Incineration |
County: |
County Durham Country: England LPA: Stockton on Tees Borough Council
|
Site ID and Reference: |
822 / 06062M5
District:
|
Applicant: |
N.E.M. LTD
Application :
00/0026/P
|
(Go to search to find Application) |
Site Address: |
Haverton Hill Road, Billingham, Teeside, Cleveland
|
|
|
County: |
County Durham Region: North East
|
OS Coordinates: |
448000 / 448000
|
Development Status: |
Abandoned
|
Application Submitted: |
1/20/2000
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
1/25/2010
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Haverton Hill Incinerator 20.1 MW
|
Energy Type: |
EfW Incineration |
County: |
County Durham Country: England LPA: Stockton on Tees Borough Council
|
Site ID and Reference: |
817 / 06002M3
District:
|
Applicant: |
Cleveland Waste Management Ltd
Application :
|
(Go to search to find Application) |
Site Address: |
Process Plant Park
Billingham
Cleveland
|
|
|
County: |
County Durham Region: North East
|
OS Coordinates: |
447900 / 447900
|
Development Status: |
Operational
|
Application Submitted: |
8/9/1993
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
5/12/1998
|
This Record Last Updated: |
5/9/2006
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Teesside EfW (extension) 10 MW
|
Energy Type: |
EfW Incineration |
County: |
County Durham Country: England LPA: Stockton on Tees Borough Council
|
Site ID and Reference: |
4926 /
District:
|
Applicant: |
SITA UK
Application :
|
(Go to search to find Application) |
Site Address: |
Haverton Hill Road, Billingham
|
|
TS23 1PY
|
County: |
County Durham Region: North East
|
OS Coordinates: |
448016 / 448016
|
Development Status: |
Operational
|
Application Submitted: |
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
1/1/2009
|
This Record Last Updated: |
1/8/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Teesside EfW 19.2 MW
|
Energy Type: |
EfW Incineration |
County: |
County Durham Country: England LPA: Stockton on Tees Borough Council
|
Site ID and Reference: |
4925 /
District:
|
Applicant: |
SITA UK
Application :
|
(Go to search to find Application) |
Site Address: |
Haverton Hill Road, Billingham
|
|
TS23 1PY
|
County: |
County Durham Region: North East
|
OS Coordinates: |
448016 / 448016
|
Development Status: |
Operational
|
Application Submitted: |
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
1/1/1998
|
This Record Last Updated: |
1/8/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Teeside 3 EfW Plant
|
Generator Type: |
Biodegradable (REGO code = MW)
|
Scheme : |
REGO
|
Generator ID: |
G00873MWEN
|
Capacity: |
12500
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
4/27/2009
|
|
|
Applicant: |
SITA UK
|
Applicant Address: |
Energy From Waste Plant
Haverton Hill Road
Billingham
TS23 1PY
England
|
Address: |
SITA UK
Haverton Hill Road
Billingham
TS23 1PY
England
|
|
Assumptions: Capacity: 12500kW 12.5 MW, Thus over the month Capacity * 720 hours per month = 9000 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 2816 | 22.53% | Issued | 01/02/2018 | | | 3186 | 25.49% | Issued | 01/01/2018 | | | 3419 | 27.35% | Issued | 01/12/2017 | | | 3565 | 28.52% | Issued | 01/11/2017 | | | 3277 | 26.22% | Issued | 01/10/2017 | | | 3449 | 27.59% | Issued | 01/09/2017 | | | 3356 | 26.85% | Issued | 01/08/2017 | | | 3658 | 29.26% | Issued | 01/07/2017 | | | 1854 | 14.83% | Retired | 01/06/2017 | | | 617 | 4.94% | Retired | 01/05/2017 | | | 3392 | 27.14% | Issued | 01/04/2017 | | | 3375 | 27.00% | Issued | 01/03/2017 | | | 2846 | 22.77% | Redeemed | 01/02/2017 | | | 3214 | 25.71% | Redeemed | 01/01/2017 | | | 3442 | 27.54% | Redeemed | Dec-16 | 0 | 0 | 3880 | 31.04% | Issued | Nov-16 | 0 | 0 | 3065 | 24.52% | Issued | Oct-16 | 0 | 0 | 3262 | 26.10% | Issued | Sep-16 | 0 | 0 | 3447 | 27.58% | Issued | Aug-16 | 0 | 0 | 3845 | 30.76% | Issued | Jul-16 | 0 | 0 | 3750 | 30.00% | Issued | Jun-16 | 0 | 0 | 3195 | 25.56% | Issued | Jun-16 | 0 | 0 | 3195 | 25.56% | Issued | Mar-16 | 0 | 0 | 2025 | 16.20% | Redeemed | Feb-16 | 0 | 0 | 2608 | 20.86% | Redeemed | Jan-16 | 0 | 0 | 3095 | 24.76% | Redeemed | Dec-15 | 0 | 0 | 3186 | 25.49% | Redeemed | Nov-15 | 0 | 0 | 2337 | 18.70% | Redeemed | Oct-15 | 0 | 0 | 3326 | 26.61% | Redeemed | Sep-15 | 0 | 0 | 1439 | 11.51% | Redeemed | Aug-15 | 0 | 0 | 2345 | 18.76% | Redeemed | Jul-15 | 2394 | 0 | 2394 | 19.15% | Redeemed | Jun-15 | 2497 | 0 | 2497 | 19.98% | Redeemed | May-15 | 2281 | 0 | 2281 | 18.25% | Redeemed | Apr-15 | 3053 | 0 | 3053 | 24.42% | Redeemed |
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|