Page views this IP this session = 6 of 10 unsubscribed pagesPaulsgrove Energy from Waste Plant
Paulsgrove (Waste , Active, Waste - EFW) Location in the UK : England, Southern England Type of installation: Waste on/offshore: on Turbines :0 Capacity : 2.415 MW Approx Date of 1st power generation:
/YES
Project INTEGRA
INTEGRA is a project devised to handle all of Hampshires household rubbish over the next 20 years or so, and involves all 14 Councils in Hampshire, along with Hampshire Waste Services (the private sector contractor). The project is aimed at reducing the level of waste which needs to be landfilled by:-
-Reducing rubbish in the first place
-Recycling and Composting 30% by 2006 and 40% in the long term
-Recovering resources from remainder (e.g. by using energy recovery incinerators) Paulsgrove Landfill Portway Paulsgrove Portsmouth PO6 4UD England
Relationship |
Company (For:
Paulsgrove
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Paulsgrove Landfill Site 2.4 MW
|
Energy Type: |
Landfill Gas |
County: |
Hampshire Country: England LPA: Portsmouth City Council
|
Site ID and Reference: |
599 / 09143L3
District:
|
Applicant: |
Associated Energy Projects plc
Application :
|
(Go to search to find Application) |
Site Address: |
Paulsgrove Landfill Site
Land east of Port Solent and south of the M27
Portsmouth
Hampshire
|
|
|
County: |
Hampshire Region: South East
|
OS Coordinates: |
464000 / 464000
|
Development Status: |
Operational
|
Application Submitted: |
5/3/1996
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
2/1/1998
|
This Record Last Updated: |
10/19/2005
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Paulsgrove LFG Energy Generation Plant No. 4
|
Generator Type: |
Landfill gas (RO code = RJ)
|
Scheme : |
RO
|
Generator ID: |
R00582RJEN
|
Capacity: |
961
|
Status: |
Live
|
Accreditation Date: |
5/3/1996
|
|
|
Commission Date: |
9/1/2008
|
|
|
Applicant: |
Veolia Environmental Services Plc
|
Applicant Address: |
Veolia Environmental Services Plc
210 Pentonville Road
London
N1 9JY
England
|
Address: |
Paulsgrove Landfill
Portway
Paulsgrove
Portsmouth
PO6 4UD
England
|
Site Name: |
Paulsgrove LFG Energy Generation Plant No. 4
|
Generator Type: |
Landfill Gas (REGO code = LG)
|
Scheme : |
REGO
|
Generator ID: |
G01432LGEN
|
Capacity: |
961
|
Status: |
Live
|
Accreditation Date: |
5/3/1996
|
|
|
Commission Date: |
9/1/2008
|
|
|
Applicant: |
Veolia Environmental Services Plc
|
Applicant Address: |
Veolia Environmental Services Plc
210 Pentonville Road
London
N1 9JY
England
|
Address: |
Paulsgrove Landfill
Portway
Paulsgrove
Portsmouth
PO6 4UD
England
|
|
Assumptions: Capacity: 961kW 0.961 MW, Thus over the month Capacity * 720 hours per month = 691.92 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 630 | 65.56% | Issued | 01/02/2017 | | | 631 | 65.66% | Revoked | Sep-16 | 0 | 0 | 637 | 66.29% | Revoked | Jan-11 | 518 | 519 | 520 | 54.11% | Redeemed | Dec-10 | 518 | 518 | 520 | 54.11% | Redeemed | Nov-10 | 454 | 454 | 456 | 47.45% | Redeemed |
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|