ElliotsHill Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

ElliotsHill Wind Farm (Wind , Active)

 General Information.

Location in the UK : N.Ireland, Co Antrim    
Type of installation: Wind    on/offshore: on
Turbines :10  Capacity : 5 MW
Approx Date of 1st power generation: April 1995

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Elliott's Hill wind farm is situated near Tildarg, Co. Antrim.

RES developed Elliott's Hill in partnership with B9 Energy and also managed the construction of the wind farm, which was completed in 1995. Elliott's Hill began generating power in March 1995. The wind farm is contracted to supply power under the 1993 Northern Ireland Non Fossil Fuel Obligation (NI-NFFO).

 Turbine Make and Specs

Model: Vestas V39 Start Speed: 5
Capacity: 0.5 Optimal Speed: 15
Rotor Diameter: 39 Stop Speed: 25
Hub Height 39   Avg for all turbines:39 Avg. Elevation: 291
Web Page:
Comment:

 Address

Elliots Hill Elliots Hill WindfarmDoashCo. AntrimNorthe Northern Ireland

 Associated Companies.

Relationship Company (For: ElliotsHill )
DeveloperRES Renewable Energy Systems Ltd
OperatorScottish Power Renewables
OwnerScottish Power Renewables
DeveloperThe B9 Energy Group

 DECC Data on this Project: ElliotsHill :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Elliot''s Hill Wind Farm     5 MW
Energy Type: Wind Onshore
County: Co. Antrim     Country: Northern Ireland     LPA: Northern Ireland Planning Service
Site ID and Reference: 3106 / N0003W1     District:
Applicant: B9 Energy Services Ltd/ ScottishPower Renewables     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 10 Turbine Capacity: 0.5
Height of Turbines: Calculated capacity: 5
Site Address: Elliot''s Hill Tildarg near Ballyclare County Antrim
 
County: Co. Antrim Region: Northern Ireland
OS Coordinates: 134974 / 134974
Development Status: Operational
Application Submitted: 11/18/1993 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 4/1/1995 This Record Last Updated: 8/29/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: ElliotsHill: Wind :

Site Name: Elliots Hill
Generator Type: On-shore wind (NIRO code = NQ)
Scheme : RO Generator ID: R00006NQNI
Capacity: 5000 Status: Live
Accreditation Date: 11/18/1993    
Commission Date: 2/1/1995    
Applicant: ScottishPower Renewables (UK) Limited
Applicant Address: Arnott House 12-16 Bridge Street Belfast BT1 1LB Northern Ireland
Address: Elliots Hill Elliots Hill WindfarmDoashCo. AntrimNorthe Northern Ireland

 Calculations


Capacity: 10
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/21/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 10 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 371658

Project Info
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School