Sorry I found no matches, Please try again. 176
vid = 1586pws_id = 352167pws_id = 352167 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.145.33.230 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

ALLERTON Energy from Waste Plant

ALLERTON (Waste , Active, Waste - EFW)

 General Information.

Location in the UK : England, North East England    
Type of installation: Waste    on/offshore: on
Turbines :0  Capacity : 3 MW
Approx Date of 1st power generation: March 2002

/YES

 Comment


 Address

Nr Knaresborough, N Yorkshire, HG5 OSD

 Associated Companies.

Relationship Company (For: ALLERTON )
Operatorinfinis

 DECC Data on this Project: ALLERTON :-na-

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Allerton Waste Recovery Park (EfW)     27 MW
Energy Type: EfW Incineration
County: North Yorkshire     Country: England     LPA: North Yorkshire County Council
Site ID and Reference: 960 / AA566     District:
Applicant: AmeyCespa     Application : NY/2011/0328/ENV (Go to search to find Application)
Site Address: nr. Knaresborough, North Yorkshire
 
County: North Yorkshire Region: Yorkshire and Humber
OS Coordinates: 440675 / 440675
Development Status: Operational
Application Submitted: 10/12/2011 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 2/15/2015    
Generator Live 3/4/2018 This Record Last Updated: 4/5/2018
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Allerton Waste Recovery Park (Waste AD)     1.1 MW
Energy Type: Anaerobic Digestion
County: North Yorkshire     Country: England     LPA: North Yorkshire County Council
Site ID and Reference: 368 / AA567     District:
Applicant: AmeyCespa     Application : NY/2011/0328/ENV (Go to search to find Application)
Site Address: Allerton Waste Recovery Park, Allerton Quarry & Landfill, Knaresborough,
  HG5
County: North Yorkshire Region: Yorkshire and Humber
OS Coordinates: 440675 / 440675
Development Status: Operational
Application Submitted: 10/12/2011 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 2/15/2015    
Generator Live 3/4/2018 This Record Last Updated: 4/5/2018
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: ALLERTON: Waste : -na-

Project Info
Banks Renewables plans 40MW solar farm near Leeds
The new Barnsdale scheme would include solar panels and battery storage covering an area of around 50 hectares of south-facing agricultural land between Kippax and ALLERTON Bywater.

Plan for 40 acre solar power and sheep farm at Ainderby Steeple
NorthALLERTON businessman David Kerfoot and his neighbours have announced their opposition to proposals to install 29,528 1.6m by 1m photovoltaic panels

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School