Loading
Page views this IP this session = 1 of 10 unsubscribed pagesArtfield Fell Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Artfield Fell Wind Farm (Wind , Active) Location in the UK : Scotland, New Luce, Stranraer Type of installation: Wind on/offshore: on Turbines :15 Capacity : 19.5 MW Approx Date of 1st power generation: July 2005
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
The wind farm, which is situated 10 miles north east of Stranraer and consists of fifteen turbines, will produce enough energy to power around 15,000 homes. It cost £16m to develop.
Model: |
Siemens SWT 1.3
|
Start Speed: |
3
|
Capacity: |
1.3
|
Optimal Speed: |
14
|
Rotor Diameter: |
62
|
Stop Speed: |
25
|
Hub Height |
43 Avg for all turbines:43
|
Avg. Elevation: |
208
|
Web Page: |
|
Comment: |
|
Artfield Fell Windfarm Artfield Fell By Glenuce DG8 0DP Scotland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Artfield Fell 19.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Dumfries and Galloway Country: Scotland LPA: Dumfries and Galloway Council
|
Site ID and Reference: |
4518 / N00160W
District:
|
Applicant: |
Scottish and Southern Energy (SSE)
Application :
03-P-1-0195
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
15 |
Turbine Capacity: |
1.3 |
Height of Turbines: |
|
Calculated capacity: |
19.5 |
Site Address: |
Artfield Fell
Near New Luce
NX230670
|
|
|
County: |
Dumfries and Galloway Region: Scotland
|
OS Coordinates: |
222500 / 222500
|
Development Status: |
Operational
|
Application Submitted: |
9/24/2003
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
6/23/2005
|
This Record Last Updated: |
6/4/2020
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Artfield Fell Windfarm - A,C
|
Generator Type: |
On-shore wind (ROS code = SQ)
|
Scheme : |
RO
|
Generator ID: |
R00059SQSC
|
Capacity: |
27600
|
Status: |
Live
|
Accreditation Date: |
9/24/2003
|
|
|
Commission Date: |
5/1/2005
|
|
|
Applicant: |
SSE Generation Ltd
|
Applicant Address: |
Scottish Hydro Electric plc
Inveralmond House
200 Dunkeld Road
Perth
PH1 3AQ
Scotland
|
Address: |
Artfield Fell Windfarm - A,C
Artfield Fell Windfarm
Artfield Fell
By Glenuce
DG8 0DP
Scotland
|
Capacity: 75.3999999999999 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|