Loading
Page views this IP this session = 1 of 10 unsubscribed pagesSiadar Bay
Siadar Bay (Wave , Cancelled) Location in the UK : Scotland, Lewis and Harris Type of installation: Wave on/offshore: off Turbines :40 Capacity : 4 MW Approx Date of 1st power generation:
/YES
On the 22nd January 2009 the Scottish Government granted consent for the Siadar Wave Energy Project (SWEP) on the Scottish island of Lewis.
The scheme would harness power from the Atlantic waves in Siadar Bay to generate up to 4 megawatts of electricity. The energy produced each year could supply the average annual electricity needs of around 1,500 homes on Lewis and Harris.
The breakwater at Siadar Bay will consist of 9-10 concrete caissons placed together on the seabed, each of approximately 25m in length. Each caisson will weigh approximately 3,000 tonnes. A total of 36 to 40 Wells turbines will be used to generate the electricity.
Relationship |
Company (For:
Siadar Bay
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Nine offshore wind farm projects awarded in UK auction The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|