Sorry I found no matches, Please try again. 176
vid = 1732pws_id = pws_id = Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.145.79.214 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Achanalt

Achanalt (Hydro , Active)

 General Information.

Location in the UK : Scotland, Highlands    
Type of installation: Hydro    on/offshore: on
Turbines :0  Capacity : 3 MW
Approx Date of 1st power generation: Jan 1956

/YES

 Comment

Achanalt is a tiny run-off-river station - part of the Conon Scheme, situated very close to Grudie Bridge power station.

 Address

Achanalt Power Station Achanalt Power Station By Loch aChuillin Near G IV23 2QD Scotland

 Associated Companies.

Relationship Company (For: Achanalt )
OperatorScottish and Southern Energy
OwnerScottish and Southern Energy

 DECC Data on this Project: Achanalt :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Achanalt     3 MW
Energy Type: Small Hydro
County: Highland     Country: Scotland     LPA: Highland Council
Site ID and Reference: 468 / EN00056     District:
Applicant: Scottish and Southern Energy (SSE)     Application : (Go to search to find Application)
Site Address: Highland
 
County: Highland Region: Scotland
OS Coordinates: 225895 / 225895
Development Status: Operational
Application Submitted: Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 1/1/1956 This Record Last Updated: 4/27/2006
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Achanalt: Hydro :

Site Name: Achanalt Power Station - A
Generator Type: Hydro 20MW DNC or less (ROS code = SE)
Scheme : RO Generator ID: R00108SESC
Capacity: 3100 Status: Live
Accreditation Date:    
Commission Date: 1/1/1956    
Applicant: SSE Generation Ltd
Applicant Address: Scottish Hydro Electric plc Inveralmond House 200 Dunkeld Road Perth PH1 3AQ Scotland
Address: Achanalt Power Station Achanalt Power Station By Loch a'Chuillin Near G IV23 2QD Scotland

Site Name: Achanalt Power Station - A
Generator Type: Hydro
Scheme : REGO Generator ID: G00276HYSC
Capacity: 3100 Status: Live
Accreditation Date:    
Commission Date: 1/1/1956    
Applicant: SSE Generation Ltd
Applicant Address: Scottish Hydro Electric plc Inveralmond House 200 Dunkeld Road Perth PH1 3AQ Scotland
Address: Achanalt Power Station Achanalt Power Station By Loch a'Chuillin Near G IV23 2QD Scotland
 
Assumptions: Capacity: 3100kW 3.1 MW,
Thus over the month Capacity * 720 hours per month = 2232 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 556 17.94% Issued
01/02/2018 914 29.48% Issued
01/01/2018 921 29.71% Issued
01/12/2017 1299 41.90% Issued
01/11/2017 1503 48.48% Issued
01/10/2017 1263 40.74% Issued
01/09/2017 625 20.16% Issued
01/08/2017 666 21.48% Issued
01/07/2017 252 8.13% Issued
01/06/2017 342 11.03% Issued
01/04/2017 360 11.61% Issued
01/03/2017 889 28.68% Redeemed
01/02/2017 708 22.84% Redeemed
01/01/2017 510 16.45% Redeemed
Dec-16 0933 938 30.26% Retired
Nov-16 0653 657 21.19% Issued
Oct-16 0298 303 9.77% Issued
Sep-16 0472 476 15.35% Issued
Apr-16 056 58 1.87% Issued
Mar-16 0498 501 16.16% Redeemed
Feb-16 01030 1030 33.23% Redeemed
Jan-16 0915 915 29.52% Redeemed
Dec-15 01724 1724 55.61% Retired
Nov-15 01304 1304 42.06% Retired
Oct-15 0272 274 8.84% Retired
Sep-15 0115 117 3.77% Retired
Aug-15 0303 305 9.84% Retired
Jul-15 462459 462 14.90% Redeemed
Jun-15 504501 504 16.26% Redeemed
May-15 751751 751 24.23% Redeemed
Apr-15 445442 445 14.35% Redeemed
Mar-15 937937 937 30.23% Redeemed
Feb-15 11181118 1118 36.06% Redeemed
Jan-15 12981298 1298 41.87% Redeemed
Dec-14 12631263 1263 40.74% Redeemed
Nov-14 535531 535 17.26% Redeemed
Oct-14 11341135 1135 36.61% Redeemed
Sep-14 164161 164 5.29% Redeemed
Aug-14 945945 945 30.48% Redeemed
Jul-14 4744 47 1.52% Redeemed
Jun-14 4846 48 1.55% Redeemed
May-14 6966 69 2.23% Redeemed
Apr-14 336333 336 10.84% Redeemed
Mar-14 11091109 1109 35.77% Redeemed
Feb-14 12151216 1216 39.23% Redeemed
Jan-14 961960 96 3.10% Redeemed
Dec-13 12521253 1 0.03% Redeemed
Nov-13 11471148 1 0.03% Redeemed
Oct-13 801800 800 25.81% Redeemed
Sep-13 686686 686 22.13% Redeemed
Aug-13 366364 367 11.84% Redeemed
Jul-13 6663 65 2.10% Redeemed
Jun-13 6866 68 2.19% Redeemed
May-13 697693 697 22.48% Redeemed
Apr-13 652652 652 21.03% Redeemed
Mar-13 181177 181 5.84% Redeemed
Feb-13 815815 815 26.29% Redeemed
Jan-13 651647 651 21.00% Redeemed
Dec-12 10281028 1028 33.16% Redeemed
Nov-12 11411141 1141 36.81% Redeemed
Oct-12 811811 811 26.16% Redeemed
Sep-12 880880 880 28.39% Redeemed
Aug-12 169166 169 5.45% Redeemed
Jul-12 177174 177 5.71% Redeemed
Jun-12 6058 61 1.97% Redeemed
May-12 5147 51 1.65% Redeemed
Apr-12 233229 233 7.52% Redeemed
Mar-12 612607 612 19.74% Redeemed
Feb-12 957957 957 30.87% Redeemed
Jan-12 14061406 1406 45.35% Redeemed
Dec-11 15941594 1594 51.42% Redeemed
Nov-11 670666 670 21.61% Redeemed
Oct-11 11631163 1163 37.52% Redeemed
Sep-11 12001200 1200 38.71% Redeemed
Aug-11 629624 628 20.26% Retired
Jul-11 288285 289 9.32% Retired
Jun-11 509505 509 16.42% Retired
May-11 921921 921 29.71% Retired
Apr-11 446442 445 14.35% Retired
Mar-11 735731 735 23.71% Redeemed
Feb-11 660656 660 21.29% Redeemed
Jan-11 313307 313 10.10% Redeemed
Dec-10 4942 49 1.58% Expired
Nov-10 541537 541 17.45% Expired
Oct-10 169165 168 5.42% Expired
Sep-10 2724 28 0.90% Expired

Project Info
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School