Blackcraig Wind Farm (Wind , Active) Location in the UK : Scotland, Blackcraig Hill Dumfries and Galloway Type of installation: Wind on/offshore: on Turbines :23 Capacity : 69 MW Approx Date of 1st power generation: march 2018
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
The proposed wind farm comprises 23 turbines with a maximum tip height of 110metres and an installed capacity of around 3.0MW each giving an overall site capacity of 69MW. The site was subsequently transferred to Blue Energy in May 2015, with commissioning now scheduled for the spring of 2017.
Model: |
Siemens SWT 2.3
|
Start Speed: |
4.5
|
Capacity: |
2.3
|
Optimal Speed: |
25
|
Rotor Diameter: |
101
|
Stop Speed: |
25
|
Hub Height |
70 Avg for all turbines:66
|
Avg. Elevation: |
348
|
Web Page: |
http://tinyurl.com/simens2-3 |
Comment: |
|
Blackcraig Wind FarmCorsockCastle Douglas DG7 3DZ Scotland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Blackcraig 52.9 MW
|
Energy Type: |
Wind Onshore |
County: |
Dumfries and Galloway Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
4032 / N00279W
District:
|
Applicant: |
Blue Energy
Application :
05/n/2005
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
23 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
52.9 |
Site Address: |
Blackcraig Hill, 6km NE of Balmaclellan
|
|
|
County: |
Dumfries and Galloway Region: Scotland
|
OS Coordinates: |
270500 / 270500
|
Development Status: |
Operational
|
Application Submitted: |
9/30/2005
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
1/10/2016
|
|
|
Generator Live |
3/2/2018
|
This Record Last Updated: |
5/22/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Blackcraig Wind Farm
|
Generator Type: |
On-shore wind (ROS code = SQ)
|
Scheme : |
RO
|
Generator ID: |
P00281SQSC
|
Capacity: |
52600
|
Status: |
Preliminary
|
Accreditation Date: |
9/30/2005
|
|
|
Commission Date: |
3/30/2017
|
|
|
Applicant: |
Blackcraig Wind Farm (Scotland) Limited
|
Applicant Address: |
13 Queens Road
Aberdeen
AB15 4YL
Scotland
|
Address: |
Blackcraig Wind Farm
Corsock
Castle Douglas
DG7 3DZ
Scotland
|
Capacity: 105.8 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 12/26/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|