Sorry I found no matches, Please try again. 176
vid = 1760pws_id = 351061pws_id = 351061 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.118.24.176 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Braevallich

Braevallich (Hydro , Active)

 General Information.

Location in the UK : Scotland, Loch Awe, Argyll    
Type of installation: Hydro    on/offshore: on
Turbines :2  Capacity : 2.2 MW
Approx Date of 1st power generation: 2006

/YES

 Comment

The run of river scheme was completed in 2006 and is capable of generating 2.2MW of clean electricity, which is enough to supply approximately 2,000 households.
The scheme has a minimum 50 year design life, is powered by two Pelton turbines and consists of 6 intake weirs, a powerhouse and a buried pipeline, approximately 2km in length.

 Address

Braevallich Hydroelectric Scheme Braevallcih By PA 33 1BU Scotland

 Associated Companies.

Relationship Company (For: Braevallich )
DeveloperNpower Renewables
OperatorNpower Renewables
OwnerNpower Renewables

 DECC Data on this Project: Braevallich :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Braevallich     2.2 MW
Energy Type: Small Hydro
County: Strathclyde     Country: Scotland     LPA: Argyll & Bute Council
Site ID and Reference: 503 / N00003H     District:
Applicant: Innogy     Application : 02/01407/GDCON (Go to search to find Application)
Site Address: Eredine, Braevallich, Loch Awe
 
County: Strathclyde Region: Scotland
OS Coordinates: 196657 / 196657
Development Status: Operational
Application Submitted: 8/7/2002 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 1/1/2005 This Record Last Updated: 5/9/2007
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Braevallich: Hydro :

Site Name: Braevallich Hydroelectric Scheme - A
Generator Type: Hydro 20MW DNC or less (ROS code = SE)
Scheme : RO Generator ID: R00140SESC
Capacity: 2274 Status: Live
Accreditation Date: 8/7/2002    
Commission Date: 11/1/2005    
Applicant: Innogy Renewables UK Limited (Hydro)
Applicant Address: Innogy Renewables UK Ltd Dolgarrog Power Station Dolgarrog CONWY LL32 8QE Wales
Address: Braevallich Hydroelectric Scheme - A (10/03/06) Braevallich Hydroelectric SchemeBraevallcihBy PA 33 1BU Scotland

Site Name: Braevallich Hydroelectric Scheme - A
Generator Type: Hydro
Scheme : REGO Generator ID: G00927HYEN
Capacity: 2274 Status: Live
Accreditation Date: 8/7/2002    
Commission Date: 11/1/2005    
Applicant: Innogy Renewables UK Limited (Hydro)
Applicant Address: Innogy Renewables UK Ltd Dolgarrog Power Station Dolgarrog CONWY LL32 8QE Wales
Address: Braevallich Hydroelectric Scheme - A (10/03/06) Braevallich Hydroelectric SchemeBraevallcihBy PA 33 1BU Scotland
 
Assumptions: Capacity: 2274kW 2.274 MW,
Thus over the month Capacity * 720 hours per month = 1637.28 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 420 18.47% Issued
01/02/2018 587 25.81% Issued
01/01/2018 782 34.39% Issued
01/12/2017 730 32.10% Issued
01/11/2017 768 33.77% Issued
01/10/2017 1007 44.28% Issued
01/09/2017 634 27.88% Issued
01/08/2017 738 32.45% Issued
01/07/2017 460 20.23% Issued
01/06/2017 713 31.35% Issued
01/05/2017 97 4.27% Issued
01/04/2017 324 14.25% Issued
01/03/2017 675 29.68% Redeemed
01/02/2017 704 30.96% Redeemed
01/01/2017 577 25.37% Redeemed
Dec-16 0516 516 22.69% Issued
Nov-16 0560 560 24.63% Issued
Oct-16 0254 254 11.17% Issued
Sep-16 0776 776 34.12% Issued
Aug-16 0168 168 7.39% Issued
Jul-16 0713 713 31.35% Issued
Jun-16 076 76 3.34% Issued
May-16 0175 175 7.70% Issued
Apr-16 0317 317 13.94% Issued
Mar-16 0490 490 21.55% Redeemed
Feb-16 0697 697 30.65% Redeemed
Jan-16 0824 824 36.24% Redeemed
Dec-15 01135 1135 49.91% Retired
Nov-15 0982 982 43.18% Retired
Oct-15 0345 345 15.17% Retired
Sep-15 081 81 3.56% Retired
Aug-15 0523 523 23.00% Retired
Jul-15 434433 433 19.04% Expired
Jun-15 421422 422 18.56% Expired
May-15 586586 586 25.77% Expired
Apr-15 337337 337 14.82% Expired
Mar-15 722721 721 31.71% Expired
Feb-15 664664 664 29.20% Redeemed
Jan-15 849849 849 37.34% Redeemed
Dec-14 719718 718 31.57% Redeemed
Nov-14 510510 510 22.43% Redeemed
Oct-14 763763 763 33.55% Redeemed
Sep-14 119119 119 5.23% Redeemed
Aug-14 633633 633 27.84% Redeemed
Jul-14 377377 377 16.58% Redeemed
Jun-14 104104 104 4.57% Redeemed
May-14 320320 320 14.07% Redeemed
Apr-14 381382 382 16.80% Redeemed
Mar-14 883883 883 38.83% Expired
Feb-14 11181118 1118 49.16% Expired
Jan-14 970970 969 42.61% Redeemed
Dec-13 927927 1 0.04% Expired
Nov-13 3333 33 1.45% Redeemed
Feb-13 416416 416 18.29% Redeemed
Jan-13 732732 732 32.19% Redeemed
Dec-12 716716 716 31.49% Redeemed
Nov-12 1212 12 0.53% Redeemed
Aug-12 5858 58 2.55% Redeemed
Jul-12 202202 202 8.88% Redeemed
Jun-12 9898 98 4.31% Redeemed
May-12 115115 115 5.06% Redeemed
Apr-12 118118 118 5.19% Redeemed
Mar-12 382381 381 16.75% Redeemed
Feb-12 591591 591 25.99% Redeemed
Jan-12 598598 598 26.30% Redeemed
Dec-11 654654 654 28.76% Redeemed
Nov-11 575575 575 25.29% Redeemed
Oct-11 865865 865 38.04% Redeemed
Sep-11 733733 733 32.23% Redeemed
Aug-11 302302 302 13.28% Redeemed
Jul-11 100100 100 4.40% Redeemed
Jun-11 325325 325 14.29% Redeemed
May-11 580580 580 25.51% Redeemed
Apr-11 224223 223 9.81% Redeemed
Mar-11 290291 291 12.80% Redeemed
Feb-11 568567 567 24.93% Redeemed
Jan-11 379379 379 16.67% Redeemed
Dec-10 207207 207 9.10% Redeemed
Nov-10 477478 478 21.02% Redeemed
Oct-10 464463 142 6.24% Expired

Project Info
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School