Burnfoot Hill Wind Farm (Wind , Active) Location in the UK : Scotland, Glen Eagles Stirlingshire Type of installation: Wind on/offshore: on Turbines :13 Capacity : 26 MW Approx Date of 1st power generation: 2010
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Includes Rhoders Hill Wind Farm which is an extension to Burnfoot
The Burnfoot Hill Wind Farm consists of thirteen 2MW wind turbines, each with 60m high towers and blades that are 42m long, giving an overall maximum height of 102m, and associated infrastructure including internal access tracks, crane hardstandings, a switchgear building, a permanent anemometer mast and potentially two borrow pits.
Proposed Extension
A maximum of 22 turbines (up to 44MW) are being considered as an extension, using the same scale of turbines as that currently installed at Burnfoot Hill
Model: |
Wind Turbine- Generic
|
Start Speed: |
5
|
Capacity: |
2
|
Optimal Speed: |
15
|
Rotor Diameter: |
100
|
Stop Speed: |
25
|
Hub Height |
60 Avg for all turbines:57
|
Avg. Elevation: |
503
|
Web Page: |
|
Comment: |
|
Rhodders FarmAlva FK12 5JY Scotland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Burnfoot East Wind Farm (further extension) 10.8 MW
|
Energy Type: |
Wind Onshore |
County: |
Clackmannanshire Country: Scotland LPA: Clackmannanshire Council
|
Site ID and Reference: |
6324 /
District:
|
Applicant: |
Wind Prospect Developments
Application :
17/00026/FULL
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
3 |
Turbine Capacity: |
3.6000000000000001 |
Height of Turbines: |
135 |
Calculated capacity: |
10.8 |
Site Address: |
Site West Of Burnfoot Hill, High Street, Tillicoultry, Central
|
|
FK13 6A
|
County: |
Clackmannanshire Region: Scotland
|
OS Coordinates: |
290930 / 290930
|
Development Status: |
Under Construction
|
Application Submitted: |
1/30/2017
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
9/1/2019
|
|
|
Generator Live |
|
This Record Last Updated: |
9/21/2020
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Burnfoot Hill Extension 4 MW
|
Energy Type: |
Wind Onshore |
County: |
Tayside Country: Scotland LPA: Perth & Kinross Council
|
Site ID and Reference: |
4450 / AA629
District:
|
Applicant: |
Private Developer
Application :
11/01930/FLL
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
2 |
Turbine Capacity: |
2 |
Height of Turbines: |
|
Calculated capacity: |
4 |
Site Address: |
Site South Of The Upper And Lower Glendevon Resevoirs Glendevon
|
|
|
County: |
Tayside Region: Scotland
|
OS Coordinates: |
290393 / 290393
|
Development Status: |
Operational
|
Application Submitted: |
12/9/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
9/9/2014
|
This Record Last Updated: |
9/11/2014
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Rhodders Wind Farm 12 MW
|
Energy Type: |
Wind Onshore |
County: |
Clackmannanshire Country: Scotland LPA: Clackmannanshire Council
|
Site ID and Reference: |
4223 / B0255
District:
|
Applicant: |
EDF/Wind Prospect
Application :
11/00299/FULL
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
6 |
Turbine Capacity: |
2 |
Height of Turbines: |
|
Calculated capacity: |
12 |
Site Address: |
Site West Of Burnfoot Hill Tillicoultry Clackmannanshire
|
|
FK13 6A
|
County: |
Clackmannanshire Region: Scotland
|
OS Coordinates: |
289525 / 289525
|
Development Status: |
Operational
|
Application Submitted: |
11/7/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
7/8/2013
|
Construction Date: |
8/1/2015
|
|
|
Generator Live |
2/29/2016
|
This Record Last Updated: |
2/29/2016
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
7/8/2013 |
Site Name: |
Burnfoot Hill 26 MW
|
Energy Type: |
Wind Onshore |
County: |
Clackmannanshire Country: Scotland LPA: Clackmannanshire Council
|
Site ID and Reference: |
2902 / EN00034
District:
|
Applicant: |
EDF Energies Nouvelles
Application :
06/00121/FULL
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
13 |
Turbine Capacity: |
2 |
Height of Turbines: |
|
Calculated capacity: |
26 |
Site Address: |
Burnfoot Hill, Clackmannanshire
|
|
|
County: |
Clackmannanshire Region: Scotland
|
OS Coordinates: |
290135 / 290135
|
Development Status: |
Operational
|
Application Submitted: |
3/20/2006
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
8/1/2010
|
|
|
Generator Live |
10/26/2010
|
This Record Last Updated: |
11/3/2010
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Rhodders
|
Generator Type: |
On-shore wind (ROS code = SQ)
|
Scheme : |
RO
|
Generator ID: |
R00295SQSC
|
Capacity: |
12240
|
Status: |
Live
|
Accreditation Date: |
3/20/2006
|
|
|
Commission Date: |
11/24/2015
|
|
|
Applicant: |
BURNFOOT WINDFARM LIMITED
|
Applicant Address: |
40 GROSVENOR PLACE
LONDON
SW1X 7EN
England
|
Address: |
Rhodders Farm
Alva
FK12 5JY
Scotland
|
Site Name: |
Rhodders
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02364NWSC
|
Capacity: |
12240
|
Status: |
Live
|
Accreditation Date: |
3/20/2006
|
|
|
Commission Date: |
11/24/2015
|
|
|
Applicant: |
BURNFOOT WINDFARM LIMITED
|
Applicant Address: |
40 GROSVENOR PLACE
LONDON
SW1X 7EN
England
|
Address: |
Rhodders Farm
Alva
FK12 5JY
Scotland
|
|
Assumptions: Capacity: 12240kW 12.24 MW, Thus over the month Capacity * 720 hours per month = 8812.8 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 2651 | 21.66% | Issued | 01/02/2018 | | | 2498 | 20.41% | Issued | 01/01/2018 | | | 3191 | 26.07% | Issued | 01/12/2017 | | | 3002 | 24.53% | Issued | 01/11/2017 | | | 4242 | 34.66% | Issued | 01/10/2017 | | | 5437 | 44.42% | Issued | 01/09/2017 | | | 2798 | 22.86% | Issued | 01/08/2017 | | | 3177 | 25.96% | Issued | 01/07/2017 | | | 3106 | 25.38% | Issued | 01/06/2017 | | | 3677 | 30.04% | Issued | 01/05/2017 | | | 2122 | 17.34% | Issued | 01/04/2017 | | | 3988 | 32.58% | Issued | 01/03/2017 | | | 3857 | 31.51% | Redeemed | 01/02/2017 | | | 3932 | 32.12% | Redeemed | 01/01/2017 | | | 3937 | 32.17% | Redeemed | Dec-16 | 0 | 4435 | 4927 | 40.25% | Issued | Nov-16 | 0 | 2374 | 2637 | 21.54% | Issued | Oct-16 | 0 | 2096 | 2329 | 19.03% | Issued | Sep-16 | 0 | 3293 | 3659 | 29.89% | Issued | Aug-16 | 0 | 2505 | 2784 | 22.75% | Issued | Jul-16 | 0 | 2705 | 3005 | 24.55% | Issued | Jun-16 | 0 | 1243 | 1391 | 11.36% | Issued | May-16 | 0 | 2054 | 2282 | 18.64% | Issued | Apr-16 | 0 | 2125 | 2361 | 19.29% | Issued |
|
Capacity: 160 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 21 m/s (46.977 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 11/21/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Nine offshore wind farm projects awarded in UK auction The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|