Loading
Page views this IP this session = 5 of 10 unsubscribed pagesSheerness Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Sheerness Wind Farm (Wind , Active) Location in the UK : England, Sheerness, Sheppy, Kent Type of installation: Wind on/offshore: on Turbines :4 Capacity : 10 MW Approx Date of 1st power generation: January 2016
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
The proposed scheme will consist of four 2.5–3-MW turbines, each with a total maximum height of 125m. The wind farm is expected to produce enough power for 5500 homes, which equates to 13% of the wind energy target for the Kent region.
Planning permission was granted in March 2009. A number of technical studies have been undertaken and are ongoing. Procurement will commence during 2014 with construction planned in 2015.
Model: |
Gamesa G80
|
Start Speed: |
6
|
Capacity: |
2
|
Optimal Speed: |
13
|
Rotor Diameter: |
80
|
Stop Speed: |
21
|
Hub Height |
60 Avg for all turbines:60
|
Avg. Elevation: |
4
|
Web Page: |
http://www.gamesacorp.com/recursos/doc/productos-servicios/aerogeneradores/catalogo-g9x-20-mw-eng.pdf |
Comment: |
|
Sheerness Wind FarmPort of Sheerness Isle of Sheppey Sheerness ME12 1RS England
Relationship |
Company (For:
Sheerness
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Port of Sheerness Wind Farm (was Lappel Bank) 8.2 MW
|
Energy Type: |
Wind Onshore |
County: |
Kent Country: England LPA: Swale Borough Council
|
Site ID and Reference: |
3738 / A0446
District:
|
Applicant: |
Peel Energy
Application :
SW/08/0896
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
4 |
Turbine Capacity: |
2.0499999999999998 |
Height of Turbines: |
125 |
Calculated capacity: |
8.2 |
Site Address: |
Sheerness Docks, Sheerness, Kent
|
|
ME12 1RS
|
County: |
Kent Region: South East
|
OS Coordinates: |
591061 / 591061
|
Development Status: |
Operational
|
Application Submitted: |
8/26/2008
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
8/6/2015
|
|
|
Generator Live |
9/20/2016
|
This Record Last Updated: |
10/24/2016
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Sheerness Wind Farm
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00356RQEN
|
Capacity: |
8100
|
Status: |
Live
|
Accreditation Date: |
8/26/2008
|
|
|
Commission Date: |
6/21/2016
|
|
|
Applicant: |
Port of Sheerness Wind Farm Ltd
|
Applicant Address: |
Peel Dome
The Trafford Centre
Manchester
M17 8PL
England
|
Address: |
Sheerness Wind Farm
Port of Sheerness
Isle of Sheppey
Sheerness
ME12 1RS
England
|
Site Name: |
Sheerness Wind Farm
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02987NWEN
|
Capacity: |
8100
|
Status: |
Live
|
Accreditation Date: |
8/26/2008
|
|
|
Commission Date: |
6/21/2016
|
|
|
Applicant: |
Port of Sheerness Wind Farm Ltd
|
Applicant Address: |
Peel Dome
The Trafford Centre
Manchester
M17 8PL
England
|
Address: |
Sheerness Wind Farm
Port of Sheerness
Isle of Sheppey
Sheerness
ME12 1RS
England
|
|
Assumptions: Capacity: 8100kW 8.1 MW, Thus over the month Capacity * 720 hours per month = 5832 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/05/2018 | | | 1040 | 12.84% | Issued | 01/04/2018 | | | 1931 | 23.84% | Issued | 01/03/2018 | | | 2339 | 28.88% | Issued | 01/02/2018 | | | 2884 | 35.60% | Issued | 01/01/2018 | | | 3346 | 41.31% | Issued | 01/12/2017 | | | 3160 | 39.01% | Retired | 01/11/2017 | | | 2548 | 31.46% | Retired | 01/10/2017 | | | 2844 | 35.11% | Retired | 01/09/2017 | | | 1769 | 21.84% | Retired | 01/08/2017 | | | 1607 | 19.84% | Issued | 01/07/2017 | | | 1823 | 22.51% | Issued | 01/06/2017 | | | 2142 | 26.44% | Retired | 01/05/2017 | | | 1682 | 20.77% | Issued | 01/04/2017 | | | 1400 | 17.28% | Issued | 01/03/2017 | | | 2993 | 36.95% | Issued | 01/02/2017 | | | 2578 | 31.83% | Issued | 01/01/2017 | | | 1931 | 23.84% | Issued | Dec-16 | 0 | 1583 | 1759 | 21.72% | Pending Tr | Nov-16 | 0 | 2394 | 2660 | 32.84% | Pending Tr | Oct-16 | 0 | 1512 | 1680 | 20.74% | Pending Tr | Sep-16 | 0 | 1307 | 1453 | 17.94% | Issued | Aug-16 | 0 | 1129 | 1254 | 15.48% | Pending Tr | Jul-16 | 0 | 504 | 560 | 6.91% | Pending Tr |
|
Capacity: 35 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 21 m/s (46.977 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|