Loading
Page views this IP this session = 1 of 10 unsubscribed pagesShooters Bottom Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Shooters Bottom Wind Farm (Wind , Active) Location in the UK : England, Somerset Type of installation: Wind on/offshore: on Turbines :1 Capacity : 2 MW Approx Date of 1st power generation: June 2008
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
More than fifteen years after the UK got its first modern wind turbine, and four years after Ecotricity first applied to the local council to build one Somerset joined the energy revolution in June 2008.
Model: |
Wind Turbine- Generic
|
Start Speed: |
5
|
Capacity: |
2
|
Optimal Speed: |
15
|
Rotor Diameter: |
100
|
Stop Speed: |
25
|
Hub Height |
0 Avg for all turbines:0
|
Avg. Elevation: |
0
|
Web Page: |
|
Comment: |
|
Shooters Bottom Farm Townsend Lane Chewton Mendip BA3 4LU England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Shooters Bottom Wind Park 2 MW
|
Energy Type: |
Wind Onshore |
County: |
Somerset Country: England LPA: Mendip District Council
|
Site ID and Reference: |
3161 / N00129W
District:
|
Applicant: |
Ecotricity
Application :
116407-000
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
1 |
Turbine Capacity: |
2 |
Height of Turbines: |
|
Calculated capacity: |
2 |
Site Address: |
Shooters Bottom, Chewton Mendip,
|
|
|
County: |
Somerset Region: South West
|
OS Coordinates: |
359380 / 359380
|
Development Status: |
Operational
|
Application Submitted: |
9/15/2003
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
5/24/2005
|
Construction Date: |
|
|
|
Generator Live |
6/16/2008
|
This Record Last Updated: |
5/6/2009
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
5/24/2005 |
Site Name: |
Shooters Bottom Wind Park Ltd
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00202RQEN
|
Capacity: |
2000
|
Status: |
Live
|
Accreditation Date: |
9/15/2003
|
|
|
Commission Date: |
6/16/2008
|
|
|
Applicant: |
Ecotricity Group Ltd
|
Applicant Address: |
Ecotricity
Lion House
Rowcroft
Stroud
GL5 3BY
England
|
Address: |
Shooters Bottom Farm
Townsend Lane
Chewton
Mendip
BA3 4LU
England
|
Capacity: 4 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 11/21/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Nine offshore wind farm projects awarded in UK auction The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|